eference Materia
1.
1907-01-01 Water Power Engineering (Mead)2.
1923-01-01
Hydro-Electric Power Stations (David Rushmore & Eric Lof)3.
1929-09-02
Simple Basis for Securing Efficient Hydro Operation (F. Nagler)4.
1933-04-01
Improved Type of Flow Meter for Hydraulic Turbines (I.A. Winter)
4a. Winter-Kennedy Tap Placement Principles4b.
usbr.gov tech references 5.
1940-12-02 Turbine Efficiency At Safe
Harbor (Mousson)6.
2011-01-01
PTC-18 Credits Page
6b 2011-01-01
OCR from PTC-18 Credits Page7.
1949-01-01 PTC-18 Index Test Supplement (ASME)8.
1950-01-01 Hydroelectric Handbook (Creager, Justin)9.
1951-01-01 Water Turbines excerpted from "Hydro-electric
Engineering Practice (P.E. Deriaz)
10.
1953-12-03 Optimum Adjustment of Control Loops (Oldenburger)
11.
1954-01-01 Selecting Hydraulic Reaction Turbines (USBR)12.
1954-01-11 Frequency Response Data Presentation Methods (Rufus
Oldenberger)13.
1955-07-01 Index Testing of Hydraulic Turbines (Voaden)14.
1956-01-01 Speech notes (Voaden)15.
1957-08-01
NEMA Code.pdf16.
1958-09-01 Determination of WR^2 (NEMA)17. 1961-02-01
The Instability of Stratified Flow (Mittendorf M.S. Thesis, State University of
Iowa, available on loan)18.
1963-05-01 Turbine Testing by the Gibson and Index Methods
(USACE)19.
1966-10-05 The Controlled System (M Leum)20.
1967-12-01 Field Observations of Transient Servopressures In
Kaplan Turbines (Mittendorf, Verna)
20b 1968-07-27_Index_Method_for_Pumping_Operation_of_Reverible_Pump-Turbine_(Yamabe,Yamaguchi)21.
1970-07-08
Mark Invites George (Leum)22.
1976-11-01
Viktor Kaplan: Life and Work (H. Häckert)23.
1977-06-17 Analysis of PID Governors in MultiMachine
Systems (Manitoba Hydro)24.
1977-01-01 Estimating Reversible Pump Turbine
Characteristics (USBR)25.
1977-01-01 Development of the Kaplan Turbine (Hanns G. Hansson)26.
1978-01-01
Woodward Rev-1 3-D Cam (WGC)27.
1981-04-01 Governing Kaplan Turbines for Transient Loads28. 1982-01-01 Field Testing Hydro Turbines
(Lee Sheldon)29.
1984-09-01 Measurement of
Real-Time Turbine Efficiency (Erickson, Graber)30.
1985-04-26 ITB First Field Test
(Albright)31. 1985-09-18 Clarence Cannon Test Procedure (Sachs)32. 1985-09-18 Clarence Cannon Test Report (Sachs)33.
1986-01-14 BPA Seeking ITB Demonstration (Sheldon)34. 1986-03-24
ITB Field Test Report (Albright) 35.
1986-03-26
ITB Detailed Field Test (Albright)36.
1986-03-27
Report on Index Test box (Dave Bishoff)37.
1986-04-01
Analysis of Clarence Cannon Data (Sheldon)38. 1986-06-11 BPA to Corps
(Myers)39. 1986-07-03_Pitch_to_Idaho_Power_(Annotated).pdf
39b 1986-11-01
Checking Turbine Performance by Index Testing (Kirkland, Brice).pdf40. 1987-03-01 Prime
Times ITB41. 1987-03-01 Prime Times T-70042.
Dr. Hook and his Medicine Show43. 1987-06-01 Little Black Box
for Index Testing (Albright)44.
1987-07-01
Little Black Box (Albright) Ori45.
1987-08-21 Optimization of Bulb and Kaplan Turbine
Runners (B. Velensek)46.
1987-09-01 PGE-PHP-2 Report (Gary
Hackett)47. 1987-12-01 PGE-PHP-2 Report
(Terry Bauman)48.
1987-12-04
Analysis of Bull Run (Sheldon)
48b 1988-02-15 Bull Run Cam Comparison ITB-vs-Manual
49. 1988-05-28 PHP2 Classic Test (Sheldon)
49b. 1988-05-01 Comparison Report ITB to BPA Index test
50.
1988-05-01 Kaplan Turbines:
Design Trends (A. Lugarosi & A. Massa)51. 1988-08-01 Index Testing
(Steendahl)52. 1988-08-01 Effect of Fish Diversion Screen on Turbine
Efficiency (D. Lemon et al).pdf53. 1988-12-27 U.S. Patent# 4,794,544 (Albright & George
Mittendorf)54.
1989-03-01
Prime Times ITB55.
1989-08-01 Determining Turbine Efficiency by Index Testing Hydro
Review Tech Briefs (Sheldon)56.
1990-03-27
Evaluation of USACE's "automatic index testing device"
(Sheldon)57.
1990-04-01
Woodward did not use ITB technology58.
1990-04-01
History of USACE 3D Cam (various newspaper clips)59.
1991-01-01
IEC-41 Index Testing Winter Kennedy60. 1991-06-01 Effects of Hydroelectric
Turbine Passage on Fish Early Life Stages (Cada)61. 1993-01-01
Modern Errors in Winter Kennedy (Sheldon)62.
1995-01-01
Opt-Ease Brochure (Sheldon)63.
1995-01-01
Optimization Efficiency of Multi unit Hydro Plants (Sheldon)64. 1995-04-18 Turbine
passage survival estimation for chinook salmon smolts (Oncorhynchus
tshawytscha) at a large dam on the Columbia River (Mathur, Heisey, Euston,
Skalski and Hays)65.
1995-08-25 Joint Load
Optimization (Dave Kornegay)66.
1995-10-27
21st Century Advanced Hydropower Turbine System (Brookshire et. al.)67.
1996-01-01
IGHEM Montreal Experience at Index Testing.pdf 68.
1997-01-01 U.S. Hydropower
Resource Assessment for Illinois (Reinhart et al)69.
1997-07-01
Diagnostic Evaluation of Turbine Efficiency Profiles and data (Sheldon)70.
1009-10-01
downstream Passage for Salmon at Hydroelectric Projects in the Columbia River
Basin: Development, Installation and Evaluation (Whitney, Calvin, Erho &
Coutant)71.
1996-10-10
Fish passage mitigation of impacts from hydroelectric power projects in the US
(Cada)72.
1997-03-06 Shaken Not Stirred
Recipe for Fish-Friendly Turbine (Cada)73.
1997-03-01 Development of
Biological Criteria for the Design of Advanced Hydropower Turbines (Cada,
Coutant)74.
1997-05-01 Sliding Gate
Method (Almquist, March & Franseen)75.
(2013-01-01 Late Note: A FOIA for Sliding Gate data learned it
didn't work.)76.
1998-01-01
Measuring the effect of Fish Diversion Screens (Lemon, Wittinger et al)77.
1998-06-01
Reviewing the Approaches to Hydro Optimization (Sheldon)78.
1999-07-01 Summary of
Environmentally Friendly Turbine Design Concepts (Odeh)79.
1999-08-10
The Infinite Turbine (Janet Wood)80.
1999-08-10
Water Power Magazine The Infinite Turbine (Wood)81.
1999-12-01
It's Not Easy Being Green (March, Fisher).pdf82.
1999-01-01 Status of U.S. Department Of Energy's Advanced
Hydropower Turbine Systems Program (Sale, Cada,
Reinhart, Sommers, Brookshier, Flynn)83.
2000-04-01
Tools for Environmental Monitoring and Response at Hydro Projects (Faulkner)84.
2000-04-25
Hydropower R&D: Recent Advances in Turbine Passage Technology (Brookshire,
Reinhart, Cada)85.
2000-04-01
Tools for Hydro Environmental Monitoring (Faulkner)86.
2000-12-04
BPA Completes GDACS @ McNary (BPA)87.
2001-01-01
Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap
Runner Turbine Design at Bonneville Powerhouse 1 (Carlson)88.
2001-06-16
Voith Siemens Hydro Power Generation (Richard Fisher VS-Hydro to NPCC)89.
2001-09-01 Development of
Advanced Hydroelectric Turbines to Improve Fish Passage Survival (Cada et. al.)90.
2001-12-01
HydroPower in Norway TitlePage.pdf 91.
2001-12-01 Blanket Contract and Sole Source Justification.htm92.
2001-12-01
Hydropower in Norway Mechanical Equipment (Arne Kjolle)94.
2002-04-01
Tools For Environmental
Monitoring and Response at Hydro Projects95.
2002-01-01 Application of Biological Design Criteria in Kaplan
turbines. (ORNL)96.
2003-02-06
ATECo Quote to Lee Sheldon at HDC (Albright)97.
2003-03-01
Evolution of Sensor Fish Device for Measuring Physical Conditions
in Severe Hydraulic Environments (T.J.Carlson et al)98.
2003-03-01 Regulatory
Approaches for Dissolved Oxygen at Hydropower Facilities (ORNL
Peterson et. al.)
98b 2003-06_N-Link_Proposal_to_acquire_ITB_PowerPoint_slides.pdf99. 2003-08-01
Optimizing the Corps Hydroelectric Generation on the Columbia River (Wittinger)100. 2003-08-07 ITB Cost
Estimate (Wittinger)101.
2003-08-07 ATECo Sole Source Justification (Wittinger)102.
2003-08-29 ITB Scope of Work (Roll, Wittinger)103.
2003-09-01
Identifying Effects on Fish of Pressure Changes during Turbine Passage
(Abernathy, Becker & Dauble)104. 2003-09-01
ITB Project Specification.htm105.
2003-09-06
USACE ITB Solicitation #1 (HDC)106.
2003-09-12
USACE ITB Solicitation #2 (HDC)107.
2003-10-20
Software Report (ATECo)108.
2003-10-20
Screen Gallery (ATECo)109.
2003-10-24 AGCo Claims ITB.pdf 110. 2003-12-27 Woodward's Patent Expires111.
2004-05-26
USACE Contract W9127N-04-D-0009 for Type-1 Optimizer (Ebner)112. 2004-05-26
USACE Contract Special License Agreement (Ebner)113.
2004-07-19 TX 6-006-161 ITB Software Copyright
(Albright)114.
2004-07-01
Six-Degree of Freedom Sensor Fish Design (Deng et. al.)115.
2004-07-29 Turbine Data Request.pdf116.
2004-10-12
Pre-Stop Work Memo.pdf
116b 2004-10-14_Unclear.pdf
117.
2004-10-14 Stop
Work Memo and causes.htm118.
2004-10-28 HOT Minutes.pdf119.
2004-11-02
ANSI IEEE Std-1207 Excerpt (IEEE)120.
2005-04-15 Hydro Turbine Optimization 121.
2005-04-22 T1 future.pdf 122.
2005-04-25 Modification to 3D Cam Function Needed for ITB
(Miska)
122b 2005-05-05 Executive Brief delineating the Optimization Suite.pdf
122c High_Voltage_Brief
123.
2005-05-18
ACSI McNary GDACS Reconfigure for ITB124.
2005-06-01 Kaplan cam
tuning procedure by Aleksandar Gajic et al.pdf125.
2005-06-01 Draft Best Practices WPXIV Hydro Performance
Processes R8 (March et al)126. 2005-06-08
04-D-0009-P00001 Ed as PM TL&POC.pdf127. 2005-06-22 What Ed Miska Directed Me to Remove from the
ITB Rev1 br4.pdf
127b 2005-07-14 Good
News No Zero problem.pdf
128. 2005-07-26 Amendment of Solicitation/Modification of Contract.pdf
129. 2005-08-03 HDC
explains zero problem.pdf
129b 2005-08-05 T1 Coordination Meeting (Miska).pdf130. 2005-08-11
ITB Project Interim Status Report.doc
130b 2005-08-11_T1_Options_Given_a_DOA_ATE-150_Box_(Miska)131.
2005-09-01
PIER Research on Fish Passage at California Hydropower (CA Energy Commission
Staff).pdf132.
2005-09-15
ITB Manual to Rod.html
132b 2005-10-06 ITB Project Interim Status Report.pdf133.
2005-11-01
Evaluation of Blade-Strike Models of Kaplan Turbines (PNNL)134.
2005-11-27 ITB Manual
to Rod.html135.
2005-11-30 Zeroing Out the Messenger (Harden).htm136.
2005-12-05 T1
Bench Testing MFR.pdf137.
2005-12-07 Tech info
to HDC138.
2005-12-12 McNary Field Test (Wittinger)139.
2005-12-14
T1 Test Log.htm140.
2005-12-15 Unit 9 3-D cam W Screens.jpg141.
2005-12-16 ITB Field Test Data Report.pdf142.
2005-12-16
Bad Program Icon.pdf143.
2005-12-30
McNary Unit-9 Index Test.html144.
2006-01-16
McNary Field Test (Albright)145.
2006-01-16 ITB McNary Field Test.html146.
2006-01-17
haggling prices with Ebner147.
2006-01-23
List of Fixes before Ice Harbor Test.pdf148.
2006-01-25 ITB Price to
COE.html149.
2006-01-25 HOT Minutes.htm150.
2006-01-25 ITB Price to
COE.html151. 2006-01-25 HOT Meeting ITB
Project Status.ppt (BPA)152.
2006-01-25
Ed wants to kill ITB project in favor of a project for him153.
2006-01-26 Ed Has Conflict of Interest154.
2006-02-17 Ice Harbor Data and Analysis.pdf155.
2006-02-18 Kootenai River Letter from USDOI to USACE HDC and DOE BPA.html156.
2006-02-21
Ice Harbor Field Test (Ramirez)157.
2006-02-01
Ice Harbor data (Ramirez)158.
2006-03-01
.ppt159.
2006-03-01
Pg14 ITB Code Running On GDACS.jpg160.
2006-03-01 Dan R Update on ITB
Status.htm161. 2006-03-03 HOT PPT
Page 3.JPG162.
2006-03-03
HOT Meeting PowerPoint (HDC).htm163.
2006-03-03 HOT Powerpoint.pdf164.
2006-03-03 HOT PPT all.jpg165.
2006-03-03 HOT PPT Page
1.JPG166.
2006-03-03 HOT PPT Page
2.JPG167.
2006-03-03 HOT PPT Page
3.JPG168.
2006-03-22
IEEE 1147-2005 2006-03-22 Rehab powerplants.pdf169.
2006-03-28 ATECo Ice Harbor Analysis170.
2006-04-01 Performance Period TimeLine
(ATECo)171.
2006-04-01 T1
FY06 Plan and Beyond (HDC)172.
2006-04-24 BPA to
Corps with ppt (Murphy)173.
2006-05-23 HOT Minutes.pdf174.
2006-06-01 Effects of
Turbine Passage on Salmon at Wanapum (Cada et al) 175.
2006-06-01 Improving Operations on The Columbia (Murphy)176.
2006-06-01
Efforts to reduce mortality to Hydroelectric Turbine-Passed fish (Cada et al)177.
2006-06-06 Must give
name.pdf178.
2006-06-08
Contract In-House for ITB.html179.
2006-06-13 CID
Report FA14-2035.pdf180.
2006-06-29
BPA Review of Contract (Jones).pdf181. 2006-07-01
Index Test Box Final Report uncirculated (Sheldon)182.
2006-07-31
Optimizing Dam Operations for Power and Fish (USACE, DOE)183.
2006-08-01
Kaplan Example (Hydro Performance Processes)184.
2006-08-11 One Pager.pdf
184b 2006-08-12 McNary Trip Notes (Miska).pdf185.
2006-08-13 Hydro Review excerpt USACE contract AGCo.jpg186. 2006-09-03
BPA HOT Contracting Difficulties.htm187.
2006-09-12 HOT Minutes.htm188.
2006-09-12
PowerPoint Reccomendations.pdf189.
2006-09-01
Reduced Spill at Hydropower Dams (Coutant et al)190.
2006-09-01
Index Test Box Final Report from HDC to HOT (Sheldon)191.
2006-09-19 WSJ fish kill (Fialca)192.
2006-09-29
A new Graphical Method to Reduce Turbine Index Test Data (Sheldon)193.
2006-10-06 blade spiral.htm194.
2007-07-01
Sensorfish-07-03399.pdf195.
2007-01-04 HDC Job
Solicitation.pdf196.
2008-01-03 FOIA Cover Letter (no other ITB contract).pdf]197. 2007-01-23 HOT Minutes No Longer Called Index Test Box.htm198.
2007-01-30
Very Simple Kaplan Turbine Design (Ingram)199.
2007-03-11
3-D Cam and Blade Survey Part-1.pdf200.
2007-03-11
3-D Cam and Blade Survey Part-2.pdf
201. 2007-05-16
HOT Meeting Minutes.pdf HDC Pitch T1 box (or Gate Blade Optimizer)202.
2007-07-01 DOE Hydropower Program Biennial Report for FY
2005-2006203.
2007-07-02 T1Data
Gathering Device.htm204.
2007-08-01
Biological Assessment of the Advanced Turbine Design at Wanapum Dam, 2005
(Dauble et al)205.
2007-08-06 DOE IG Whistleblower referral FOIA Denial206.
2007-08-14 HOT Minutes.pdf
GBO Report Automatic Flushing system program, Blade-Gate Controller (BGO)
pitch GBO Verification207.
2007-09-11 Manzullo to GSA208. 2007-11-01 Determining the Effect of Shear Stress on Fish
Mortality during Turbine Passage (Cada et al)209. 2007-11-07 General Martin
moves on.html210. 2007-12-06 HOT Minutes.htm T1
Perturbation, T2 and Flushing system 211. 2008-01-01
Northwest Hydro Operators Forum (BPA)212. 2008-01-03 FOIA Cover Letter (no other ITB contract).pdf213. 2008-02-08 HDC FOIA
Response.pdf214.
2008-03-01 Optimization of
Hydro Power Plants (Cateni et al) 215. 2008-03-03
Letter to BPA HOT Committee.pdf216. 2008-03-04
Pre-HOT Meeting announcement.jpg217. 2008-03-11 HOT
Minutes.pdf Dan R, abbreviated surveys, HDC 3-D Cam Operational tests,
Hard Cams, T1 Roadmap218. 2008-03-25 DOE IG Waste of funds.pdf219.
2008-05-05
NOAA Fisheries Biological Opinion Executive Summary.pdf220. 2008-06-01 Testing Time for
Kaplans (Albright)221. 2008-06-13
Digital Governor Solicitation (HDC)222.
2008-06-13 Hydro Review AGCo Contract Award.html223.
2008-07-06
Optimizing Generating Efficiency of Entire Powerhouses (Sheldon)224.
2008-06-17
NW-Hydro Operators Forum (Murphy)225.
2008-06-24
Winter Kennedy Flushing Solicitation for
McNary W9127N-08-Q-0076 226.
2008-08-03
IGHEM Italy Turbine Upgrade Efficiency (Aldo Cateni et al)227.
2008-09-01
Award in Reno (Sheldon pg-13).pdf228.
2008-10-02 HOT Meeting229.
2008-10-03
HOT Meeting (annotated)230.
2008-12-01 Iron Gate Dam Turbine Performance Air Admission
Tests.pdf231.
2009-06-10
W9127N04D0009 Contract Evaluation.htm232.
2009-06-12 Contract
Evaluation.htm233.
2009-06-14 Letter to Steven Wright at BPA (Albright)234.
2009-06-15 W9127N04D0009 Contract Evaluation.doc235.
2009-06-15
W9127N04D0009Contract Evaluation Brief.doc236.
2009-06-15
IG letter about Contract evaluation.html237.
2009-08-14 Numerical Prediction of Vortex Rope in the Draft
Tube (Lipej)238.
2009-08-21
USACE Contract closing memorandum.pdf239.
2009-09-04 ATECo
Response.htm240.
2009-10-21
HOT Mtg FOIA T1 at Chief Joseph Dam241.
2009-12-01 Performance Testing of SHP Stations (Government of
India)242.
2010-01-10
Reish Letter.html243.
2010-04-19 HOT Meeting
Minutes (BPA) 244.
2010-07-01
Efficiency Testing-New Method to Determine Turbine Absolute Flow and Absolute
Efficiency Data (Sheldon).htm245.
2010-08-06 BPA Hot Meeting
Minutes.pdf246.
2010-09-17
DOE Information Letter (Albright)247. 2010-09-21
ITB Product Description.htm248.
2010-10-21 Gate Blade
Optimizer Status - promises made.pdf249.
2010-10-23 Improved WK Calibration Method
(D.R. Topham)250.
2010-10-23 Kaplan
Optimization251.
2011-01-31
Optimization Tests of Classic Kaplan Turbines (A. Adamkowski) 252.
2011-02-01
Turbine Survival Program (NWPCC)253.
2011-02-27 Turbine Survival
Program.pdf (NWPCC)254.
2011-04-10 BPA HOT Agenda Doc0.pdf255.
2011-04-10
BPA HOT Agenda Doc1.pdf256.
2011-04-10 BPA HOT Agenda Doc2.pdf257.
2011-05-10 HOT Minutes
basics, timeline and funding.pdf
257b. 2011-05-16_Letter_To_Judge_Redden_(Sheldon)258.
2011-06-16 Hydro Optimization on the Columbia (Allen)259.
2011-06-28 Email to Gary Fredricks.html260.
2011-07-04
Email to GAO re Kaplan turbines and fish.html261.
2011-08-19 Optimizing
multi-unit-powerhouses-a-new-method (Parker et al)262.
2011-08-29
ORNL Hydropower Asset Assessment Project (BSmith)263.
2011-09-01
Determining the Best Methods for Reducing Fish Mortality (Cada, Amaral)264.
2011-09-14 DOE FOIA
BPA-2011-1861-F265.
2011-10-01 AQFlow Flowmeter Test for PTC-18266.
2011-10-06 BPA FOIA Response.html267.
2011-11-02
Design Concept of Hydro Cascade Control System (V Fustek)268.
2011-11-17 HOT Minutes.pdf269.
2011-12-06
Best Practice Catalog-Propeller-Kaplan Turbine (ORNL)270.
2012-01-01
GMS Study 2012 (Taylor, Proulx & Lampa)271.
2012-01-01 Performance Testing 20SHP Stations in India (Dr.
H.K. Verma)272.
2012-03-01 Method
to Develop Cam Curves from a Single Index Test (Sheldon)273.
2012-06-27
Experimental Analysis of Optimal Cam For Kaplan Turbine274.
2012-09-25
Northwest Hydro Operators Forum 2012 Fall
Program (BPA)275.
2012-12-01 BPA-2012-01066-FOIA
Response.pdf276.
2013-03-01
Real Time Performance Calculation (D.Q.
Feng et al).pdf277.
2013-05-21
HOT JOC Brief (BPA)278.
2013-06-12
Optimizing Multi-Unit Powerhouses: Method to Compute Unit Selection and Load
Sharing (Bass et al)279.
2013-09-16 TVA Does not use Sliding Gate FOIA response
email.html280.
2013-11-01 Turbine Optimization for Passage of Juvenile Salmon
(HDC).pdf281.
2014-01-09
Selected Experiences with Optimization Tests of Kaplan Turbines (Adamkowski et
al)282.
2014-03-26 HOT Meeting Docs.pdf283.
2014 Fall 8-Kaplan Kuhl Lai Lainel.pdf284.
2014-12-29 FOIA Request Douglas Albright.pdf285.
2015-01-05 BPA-2015-00456-FRequest.pdf286.
2015-01-20 FOIA
Extension.pdf287.
2015-02-06 US Extends bidding for cavitation repair at 58MW
Clarence Cannon Dam288.
2015-04-06 HOT Agenda 289.
2015-04-06
HOT Minutes290.
2015-05-19 Balancing Unit Efficiency and Fish Passage291.
2015-06-18 JAG Brush-Off.pdf
291b 2015-07-28 Original Email to HR292.
2015-10-20 RE Revisit the Automatic Index Test Box for Kaplan
Turbines293.
2016-01-01 Synopsis of HOT
Meetings.htm294.
2016-05-16 FOIA Response
verified, collected and stored.295.
2016-06-20 FOIA Appeal
Denial296.
2016-06-08 Frost Letter297.
2016-07-20 FOIA Denial298.
2017-05-03
2016-11-09 HOT Meeting-DRAFT-SUMMARY299.
2016-11-09
HOT Meeting Agenda-draft (1)300.
2016-11-09
HOT Meeting Agenda-draft (2)301.
2017-01-16 Automatic Unattended Index Testing is Available
Now.htm302.
2017-02-11 Sheldon’s NEPA
letter.pdf303.
2017-02-24BPA-2017-00309-F-ReleaseandClosureLetter.zip304.
2017-04-19
BPA-2017-01396-Binderof7pageswithRedactionsApplied.pdf305.
2017-05-03 2016-11-09 HOT Meeting-DRAFT-SUMMARY.pdf306.
2017-05-03
2016-11-09 HOT Meeting Agenda-draft (1).pdf307.
2017-05-03
2016-11-09 HOT Meeting Agenda-draft (2).pdf308.
2017-05-03
2016-11-09 HOT Team Actions Tab.pdf309.
2017-05-03
2016-11-09 HOT Team Actions Tab 1 Current.pdf310.
2017-05-03
2016-11-09 HOT Team Actions Tab 3 Sheet3.pdf311.
2017-05-03
BPA-2017-00310-F-Albright-FOIA Records Release & Closure Follow-Up.html312.
2017-05-03
BPA FOIA Closure Letter.pdf313.
2017-05-03 Cover
Letter.pdf314.
2017-05-17 F-Albright Acknowledgment and Closure w No records
Letter 051517.pdf315.
2017-07-13 BPA
FOIA Response.zip316.
2017-09-01
BPA-2017-01396-F-AlbrightReleaseandClosureLetter090117.pdf317.
2017-10-26
HOT Meeting DRAFT Agenda (1).pdf318.
2017-10-26
HOT Meeting DRAFT Agenda (2).pdf319.
2017-11-22 HOT Funding Memos 320.
2018-01-04
BPA-2017-00310-F-Albright-FOIA Records Release and Closure.html321.
2017-02-11 Sheldon’s NEPA
letter.pdf322.
2018-04-09
Doug Albright FOIA Clarification.htm323.
2018-05-01 How Adjusting Mechanical Governor Can Save $1
Million (Patla, Van Winkle and Parrish)324.
2018-09-13 Power Cam
Relationship (Voitenok et al)325.
2019-03-25
Letter from HDC on GBO Status.html326.
2019-03-25
Letter from HDC on GBO Status.pdf
326b 2019-04-01 Optimizing Kaplan Turbine Efficiency with Minimal Cost, Effort and Time (Sheldon) 327.
2019-05-14
Heather Breaks Contact $168.htm328.
2019-05-20 1st FOIA
No Data HDC.htm329.
2019-08-28-FOIA
Appeal BPA-2017-00310-F-Albright-FOIA.htm330.
2020-01-03
BPA-2020-00255-F-Ackn. & Response331.
2020-01-03
BPA-2020-00255-F Responsive Information332.
2020-01-03
BPA-2020-00255-F FCRPS Plants333.
2020-01-03
BPA-2020-00255-F Generation Data334.
2020-01-03
BPA-2020-00255-F Revenue Data335.
2020-02-21
Whistleblower protection RE Non-DoD Source FW Restart IG Complaint.htm336.
2020-08-24 Iso-Power cam curve
testing for optimal blades/wicket gates law for Kaplan Turbines (J. Cavalier)
337. 2021-01-11_Letter_to_James_Walsh_Chairman_of_ASME_PTC-18 Committee.htm
338.
2020-09-20 Cost of Spill.xlsx339.
2020-01-17
Synopsis of HOT Meetings.htm340.
Time Line of HOT and
others.doc341.
Time Line of HOT and others.htm342.
Best
Available Science343.
McNary Video
Resources
1.
Advanced (Fish-Friendly) Hydropower Turbine Design Development - Project 58.003 (EPRI)
2.
Alden
Screw Turbine (Spring)
3.
Chem Info
4.
Conawingo Dam
5.
Constant Power Testing (Albright)
6.
Idaho
National Laboratory Information Bridge - Hydropower Program: Advanced
Turbine Systems (INL)
7.
Mica Dam, Columbia-Shuswap, BCV0A,
Canada
8.
Northwest Power and
Conservation Council Website
9.
Old Woodward.com
10.
Optimization
(Sheldon)
11.
Pilot Valve Plate
12.
PJM Power Dispatcher
Primer, part-01
13.
PJM Power Dispatcher Primer, part-02
14.
W.A.C. Bennett Dam, Hudson's Hope,
BCV0C, Canada
15.
Water Turbines (Deriaz).pdf
16.
Woodward History Page
17.
Email to Senator
Tammy Duckworth
Lee Resume
Lee Obit
Dave Resume
Dave Obit
George Obit
How high is High-Voltage?
style="color: windowtext; text-decoration: none;">