1.     1907-01-01 Water Power Engineering (Mead)
2.     1923-01-01 Hydro-Electric Power Stations (David Rushmore & Eric Lof)
3.     1929-09-02 Simple Basis for Securing Efficient Hydro Operation (F. Nagler)
4.     1933-04-01 Improved Type of Flow Meter for Hydraulic Turbines (I.A. Winter)
a.      usbr.gov tech references
5.     1940-12-02 Turbine Efficiency At Safe Harbor (Mousson)
6.     2011-01-01 PTC-18 Credits Page
7.     1949-01-01 PTC-18 Index Test Supplement (ASME)
8.     1950-01-01 Hydroelectric Handbook (Creager, Justin)
9.     1951-01-01 Water Turbines excerpted from "Hydro-electric Engineering Practice (P.E. Deriaz)
10. 1953-12-03 Optimum Adjustment of Control Loops (Oldenburger)
11. 1954-01-01 Selecting Hydraulic Reaction Turbines (USBR)
12. 1954-01-11 Frequency Response Data Presentation Methods (Rufus Oldenberger)
13. 1955-07-01 Index Testing of Hydraulic Turbines (Voaden)
14. 1956-01-01 Speech notes (Voaden)
15. 1957-08-01 NEMA Code.pdf
16. 1958-09-01 Determination of WR^2 (NEMA)
17. 1961-02-01 The Instability of Stratified Flow (Mittendorf M.S. Thesis, State University of Iowa, available on loan)
18. 1963-05-01 Turbine Testing by the Gibson and Index Methods (USACE)
19. 1966-10-05 The Controlled System (M Leum)
20. 1967-12-01 Field Observations of Transient Servopressures In Kaplan Turbines (Mittendorf, Verna)
21. 1970-07-08 Mark Invites George (Leum)
22. 1976-11-01 Viktor Kaplan: Life and Work (H. Häckert)
23. 1977-06-17 Analysis of PID Governors in MultiMachine Systems (Manitoba Hydro)
24. 1977-01-01 Estimating Reversible Pump Turbine Characteristics (USBR)
25. 1977-01-01 Development of the Kaplan Turbine (Hanns G. Hansson)
26. 1978-01-01 Woodward Rev-1 3-D Cam (WGC)
27. 1981-04-01 Governing Kaplan Turbines for Transient Loads
28. 1982-01-01 Field Testing Hydro Turbines (Lee Sheldon)
29. 1984-09-01 Measurement  of  Real-Time  Turbine  Efficiency  (Erickson, Graber)
30. 1985-04-26 ITB First Field Test (Albright)
31. 1985-09-18 Clarence Cannon Test Procedure (Sachs)
32. 1985-09-18 Clarence Cannon Test Report (Sachs)
33. 1986-01-14 BPA Seeking ITB Demonstration (Sheldon)
34. 1986-03-24 ITB Field Test Report (Albright)
35. 1986-03-26 ITB Detailed Field Test (Albright)
36. 1986-03-27 Report on Index Test box (Dave Bishoff)
37. 1986-04-01 Analysis of Clarence Cannon Data (Sheldon)
38. 1986-06-11 BPA to Corps (Myers)
39. 1986-11-01 Checking Turbine Performance by Index Testing (Kirkland, Brice).pdf
40. 1987-03-01 Prime Times ITB
41. 1987-03-01 Prime Times T-700
42. Dr. Hook and his Medicine Show
43. 1987-06-01 Little Black Box for Index Testing (Albright)
44. 1987-07-01 Little Blade Box (Albright) Ori
45. 1987-08-21 Optimization of Bulb and Kaplan Turbine Runners (B. Velensek)
46. 1987-09-01 PGE-PHP-2 Report (Gary Hackett)
47. 1987-12-01 PGE-PHP-2 Report (Terry Bauman)
48. 1987-12-04 Analysis of  Bull  Run  (Sheldon)
49. 1988-05-28 PHP2 Classic Test (Sheldon)
49b. 1988-05-01 Comparison Report ITB to BPA Index test  
50. 1988-05-01 Kaplan Turbines: Design Trends (A. Lugarosi & A. Massa)
51. 1988-08-01 Index Testing (Steendahl)
52. 1988-08-01 Effect of Fish Diversion Screen on Turbine Efficiency (D. Lemon et al).pdf
53. 1988-12-27 U.S. Patent# 4,794,544 (Albright & George Mittendorf)
54. 1989-03-01 Prime Times ITB
55. 1989-08-01 Determining Turbine Efficiency by Index Testing Hydro Review Tech Briefs (Sheldon)
56. 1990-03-27 Evaluation of USACE's "automatic index testing device"  (Sheldon)
57. 1990-04-01 Woodward did not use ITB technology
58. 1990-04-01 History of USACE 3D Cam (various newspaper clips)
59. 1991-01-01 IEC-41 Index Testing Winter Kennedy
60. 1991-06-01 Effects of Hydroelectric Turbine Passage on Fish Early Life Stages (Cada)
61. 1993-01-01 Modern Errors in Winter Kennedy (Sheldon)
62. 1995-01-01 Opt-Ease Brochure (Sheldon)
63. 1995-01-01 Optimization Efficiency of Multi unit Hydro Plants (Sheldon)
64. 1995-04-18 Turbine passage survival estimation for chinook salmon smolts (Oncorhynchus tshawytscha) at a large dam on the Columbia River (Mathur, Heisey, Euston, Skalski and Hays)
65. 1995-08-25 Joint  Load  Optimization  (Dave  Kornegay)
66. 1995-10-27 21st Century Advanced Hydropower Turbine System (Brookshire et. al.)
67. 1996-01-01 IGHEM Montreal Experience at Index Testing.pdf 
68. 1997-01-01 U.S. Hydropower Resource Assessment for Illinois (Reinhart et al)
69. 1997-07-01 Diagnostic Evaluation of Turbine Efficiency Profiles and data (Sheldon)
70. 1009-10-01 downstream Passage for Salmon at Hydroelectric Projects in the Columbia River Basin: Development, Installation and Evaluation (Whitney, Calvin, Erho & Coutant)
71. 1996-10-10 Fish passage mitigation of impacts from hydroelectric power projects in the US (Cada)
72. 1997-03-06 Shaken Not  Stirred  Recipe  for  Fish-Friendly  Turbine (Cada)
73. 1997-03-01 Development of Biological Criteria for the Design of Advanced Hydropower Turbines (Cada, Coutant)
74. 1997-05-01 Sliding  Gate  Method  (Almquist, March & Franseen)
75. (2013-01-01 Late Note: A FOIA for Sliding Gate data learned it didn't work.)
76. 1998-01-01 Measuring the effect of Fish Diversion Screens (Lemon, Wittinger et al)
77. 1998-06-01 Reviewing the Approaches to Hydro Optimization (Sheldon)
78. 1999-07-01 Summary of Environmentally Friendly Turbine Design Concepts (Odeh)
79. 1999-08-10 The Infinite Turbine (Janet Wood)
80. 1999-08-10 Water Power Magazine The Infinite Turbine (Wood)
81. 1999-12-01 It's Not Easy Being Green (March, Fisher).pdf
82. 1999-01-01 Status of U.S. Department  Of  Energy's  Advanced  Hydropower  Turbine  Systems  Program  (Sale, Cada, Reinhart, Sommers, Brookshier, Flynn)
83. 2000-04-01 Tools for Environmental Monitoring and Response at Hydro Projects (Faulkner)
84. 2000-04-25 Hydropower R&D: Recent Advances in Turbine Passage Technology (Brookshire, Reinhart, Cada)
85. 2000-04-01 Tools for Hydro Environmental Monitoring (Faulkner)
86. 2000-12-04 BPA Completes GDACS @ McNary (BPA)
87. 2001-01-01 Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Powerhouse 1 (Carlson)
88. 2001-06-16 Voith Siemens Hydro Power Generation (Richard Fisher VS-Hydro to NPCC)
89. 2001-09-01 Development of Advanced Hydroelectric Turbines to Improve Fish Passage Survival (Cada et. al.)
90. 2001-12-01 HydroPower in Norway TitlePage.pdf
91. 2001-12-01 Blanket Contract and Sole Source Justification.htm
92. 2001-12-01 Hydropower in Norway Mechanical Equipment (Arne Kjolle)
94. 2002-04-01 Tools  For  Environmental  Monitoring  and  Response  at  Hydro  Projects
95. 2002-01-01 Application of Biological Design Criteria in Kaplan turbines. (ORNL)
96. 2003-02-06 ATECo Quote to Lee Sheldon at HDC (Albright)
97. 2003-03-01 Evolution of Sensor Fish Device for Measuring Physical Conditions in Severe Hydraulic Environments (T.J.Carlson et al)
98. 2003-03-01 Regulatory Approaches for Dissolved Oxygen at Hydropower Facilities (ORNL Peterson et. al.)
99. 2003-08-01 Optimizing the Corps Hydroelectric Generation on the Columbia River (Wittinger)
100. 2003-08-07 ITB Cost Estimate (Wittinger)
101. 2003-08-07 ATECo Sole Source Justification (Wittinger)
102. 2003-08-29 ITB Scope of Work (Roll, Wittinger)
103. 2003-09-01 Identifying Effects on Fish of Pressure Changes during Turbine Passage (Abernathy, Becker & Dauble)
104. 2003-09-01 ITB Project Specification.htm
105. 2003-09-06 USACE ITB Solicitation #1 (HDC)
106. 2003-09-12 USACE ITB Solicitation #2 (HDC)
107. 2003-10-20 Software Report (ATECo)
108. 2003-10-20 Screen Gallery (ATECo)
109.  2003-10-24 AGCo Claims ITB.pdf
110.  2003-12-27 Woodward's Patent Expires
111.  2004-05-26 USACE Contract W9127N-04-D-0009 for Type-1 Optimizer (Ebner)
112.  2004-05-26 USACE Contract Special License Agreement (Ebner)
113.  2004-07-19 TX 6-006-161 ITB Software Copyright  (Albright)
114.  2004-07-01 Six-Degree of Freedom Sensor Fish Design (Deng et. al.)
115.  2004-07-29 Turbine Data Request.pdf
116.  2004-10-12 Pre-Stop Work Memo.pdf
117.  2004-10-14 Stop Work Memo and causes.htm
118.  2004-10-28 HOT Minutes.pdf
119.  2004-11-02 ANSI IEEE Std-1207 Excerpt (IEEE)
120.  2005-04-15 Hydro Turbine Optimization
121.  2005-04-22 T1 future.pdf
122.  2005-04-25 Modification to 3D Cam Function Needed for ITB (Miska)
123.  2005-05-18 ACSI McNary GDACS Reconfigure for ITB
124.  2005-06-01 Kaplan cam tuning procedure by Aleksandar Gajic et al.pdf
125.  2005-06-01 Draft Best Practices WPXIV Hydro Performance Processes R8 (March et al)
126.  2005-06-08 04-D-0009-P00001 Ed as PM TL&POC.pdf
127.  2005-06-22 What Ed Miska Directed Me to Remove from the ITB Rev1 br4.pdf
128.  2005-07-14 Good News No Zero problem.pdf
129.  2005-08-03 HDC explains zero problem.pdf
130.  2005-08-11 ITB Project Interim Status Report.doc
131.  2005-09-01 PIER Research on Fish Passage at California Hydropower (CA Energy Commission Staff).pdf
132.  2005-09-15 ITB Manual to Rod.html 
133.  2005-11-01 Evaluation of Blade-Strike Models of Kaplan Turbines (PNNL)
134.  2005-11-27 ITB Manual to Rod.html
135.  2005-11-30 Zeroing Out the Messenger (Harden).htm
136.  2005-12-05 T1 Bench Testing MFR.pdf
137.  2005-12-07 Tech info to HDC
138.  2005-12-12 McNary Field Test (Wittinger)
139.  2005-12-14 T1 Test Log.htm
140.  2005-12-15 Unit 9 3-D cam W Screens.jpg
141.  2005-12-16 ITB Field Test Data Report.pdf
142.  2005-12-16 Bad Program Icon.pdf
143.  2005-12-30 McNary Unit-9 Index Test.html
144.  2006-01-16 McNary Field Test (Albright)
145.  2006-01-16 ITB McNary Field Test.html
146.  2006-01-17 haggling prices with Ebner
147.  2006-01-23 List of Fixes before Ice Harbor Test.pdf
148.  2006-01-25 ITB Price to COE.html
149.  2006-01-25 HOT Minutes.htm
150.  2006-01-25 ITB Price to COE.html
151.  2006-01-25 HOT Meeting ITB Project Status.ppt (BPA)
152.  2006-01-25 Ed wants to kill ITB project in favor of a project for him
153.  2006-01-26 Ed Has Conflict of Interest
154.  2006-02-17 Ice Harbor Data and Analysis.pdf
155.  2006-02-18 Kootenai River Letter from USDOI to USACE HDC and DOE BPA.html
156.  2006-02-21 Ice Harbor Field Test (Ramirez)
157.  2006-02-01 Ice Harbor data (Ramirez)
158.  2006-03-01 Optimization.ppt
159.  2006-03-01 Pg14 ITB Code Running On GDACS.jpg
160.  2006-03-01 Dan R Update on ITB Status.htm
161.  2006-03-03 HOT PPT Page 3.JPG
162.  2006-03-03 HOT Meeting PowerPoint (HDC).htm
163.  2006-03-03 HOT Powerpoint.pdf
164.  2006-03-03 HOT PPT all.jpg
165.  2006-03-03 HOT PPT Page 1.JPG
166.   2006-03-03 HOT PPT Page 2.JPG
167.   2006-03-03 HOT PPT Page 3.JPG
168.   2006-03-22 IEEE 1147-2005 2006-03-22 Rehab powerplants.pdf
169.   2006-03-28 ATECo Ice Harbor Analysis
170.   2006-04-01 Performance Period TimeLine (ATECo)
171.   2006-04-01 T1 FY06 Plan and Beyond (HDC)
172.   2006-04-24 BPA to Corps with ppt (Murphy)
173.   2006-05-23 HOT Minutes.pdf
174.   2006-06-01 Effects of Turbine Passage on Salmon at Wanapum (Cada et al) 
175.   2006-06-01 Improving Operations on The Columbia (Murphy)
176.   2006-06-01 Efforts to reduce mortality to Hydroelectric Turbine-Passed fish (Cada et al)
177.   2006-06-06 Must give name.pdf
178.   2006-06-08 Contract In-House for ITB.html
179.   2006-06-13 CID Report FA14-2035.pdf
180.   2006-06-29 BPA Review of Contract (Jones).pdf
181.    2006-07-01 Index Test Box Final Report uncirculated (Sheldon)
182.   2006-07-31 Optimizing Dam Operations for Power and Fish (USACE, DOE)
183.   2006-08-01 Kaplan Example (Hydro Performance Processes)
184.   2006-08-11 One Pager.pdf
185.   2006-08-13 Hydro Review excerpt USACE contract AGCo.jpg
186.   2006-09-03 BPA HOT Contracting Difficulties.htm
187.   2006-09-12 HOT Minutes.htm
188.   2006-09-12 PowerPoint Reccomendations.pdf
189.   2006-09-01 Reduced Spill at Hydropower Dams (Coutant et al)
190.   2006-09-01 Index Test Box Final Report from HDC to HOT (Sheldon)
191.   2006-09-19 WSJ fish kill (Fialca)
192.   2006-09-29 A new Graphical Method to Reduce Turbine Index Test Data (Sheldon)
193.   2006-10-06 blade spiral.htm
194.   2007-07-01 Sensorfish-07-03399.pdf
195.   2007-01-04 HDC Job Solicitation.pdf
196.   2008-01-03 FOIA Cover Letter (no other ITB contract).pdf]
197. 2007-01-23 HOT Minutes No Longer Called Index Test Box.htm
198.   2007-01-30 Very Simple Kaplan Turbine Design (Ingram)
199.   2007-03-11 3-D Cam and Blade Survey Part-1.pdf
200.   2007-03-11 3-D Cam and Blade Survey Part-2.pdf
201.   2007-05-16 HOT Meeting Minutes.pdf   HDC Pitch T1 box (or Gate Blade Optimizer)
202.   2007-07-01 DOE Hydropower Program Biennial Report for FY 2005-2006
203.   2007-07-02 T1Data Gathering Device.htm
204.  2007-08-01 Biological Assessment of the Advanced Turbine Design at Wanapum Dam, 2005 (Dauble et al)
205.  2007-08-06 DOE IG Whistleblower referral FOIA Denial
206.  2007-08-14 HOT Minutes.pdf GBO Report Automatic Flushing system program, Blade-Gate Controller (BGO) pitch GBO Verification
207.  2007-09-11 Manzullo to GSA
208.  2007-11-01 Determining the Effect of Shear Stress on Fish Mortality during Turbine Passage (Cada et al)
209.  2007-11-07 General Martin moves on.html
210.  2007-12-06 HOT Minutes.htm T1 Perturbation, T2 and  Flushing system
211.  2008-01-01 Northwest Hydro Operators Forum (BPA)
212.  2008-01-03 FOIA Cover Letter (no other ITB contract).pdf
213.  2008-02-08 HDC FOIA Response.pdf
214.  2008-03-01 Optimization of Hydro Power Plants (Cateni et al)
215.  2008-03-03 Letter to BPA HOT Committee.pdf
216.  2008-03-04 Pre-HOT Meeting announcement.jpg
217.   2008-03-11 HOT Minutes.pdf Dan R, abbreviated surveys, HDC 3-D Cam Operational tests, Hard Cams, T1 Roadmap
218.   2008-03-25 DOE IG Waste of funds.pdf
219.   2008-05-05 NOAA Fisheries Biological Opinion Executive Summary.pdf
220.   2008-06-01 Testing Time for Kaplans (Albright)
221.   2008-06-13 Digital Governor Solicitation (HDC)
222.   2008-06-13 Hydro Review AGCo Contract Award.html
223.  2008-07-06 Optimizing Generating Efficiency of Entire Powerhouses (Sheldon)
224.   2008-06-17 NW-Hydro Operators Forum (Murphy)
225.  2008-06-24 Winter  Kennedy  Flushing Solicitation for McNary W9127N-08-Q-0076
226.  2008-08-03 IGHEM Italy Turbine Upgrade Efficiency (Aldo Cateni et al)
227.   2008-09-01 Award in Reno (Sheldon pg-13).pdf
228.   2008-10-02 HOT Meeting
229.   2008-10-03 HOT Meeting (annotated)
230.   2008-12-01 Iron Gate Dam Turbine Performance Air Admission Tests.pdf
231.   2009-06-10 W9127N04D0009 Contract Evaluation.htm
232.   2009-06-12 Contract Evaluation.htm
233.   2009-06-14 Letter to Steven Wright at BPA (Albright)
234.   2009-06-15 W9127N04D0009 Contract Evaluation.doc
235.   2009-06-15 W9127N04D0009Contract Evaluation Brief.doc
236.   2009-06-15 IG letter about Contract evaluation.html
237.   2009-08-14 Numerical Prediction of Vortex Rope in the Draft Tube (Lipej)
238.   2009-08-21 USACE Contract closing memorandum.pdf
239.   2009-09-04 ATECo Response.htm
240.   2009-10-21 HOT Mtg FOIA T1 at Chief Joseph Dam
241.   2009-12-01 Performance Testing of SHP Stations (Government of India)
242.   2010-01-10 Reish Letter.html
243.   2010-04-19 HOT Meeting Minutes (BPA) 
244.   2010-07-01 Efficiency Testing-New Method to Determine Turbine Absolute Flow and Absolute Efficiency Data (Sheldon).htm
245.   2010-08-06 BPA Hot Meeting Minutes.pdf
246.   2010-09-17 DOE Information Letter (Albright)
247.   2010-09-21 ITB Product Description.htm
248.   2010-10-21 Gate Blade Optimizer Status - promises made.pdf
249.   2010-10-23 Improved WK Calibration Method (D.R. Topham)
250.   2010-10-23 Kaplan Optimization
251.   2011-01-31 Optimization Tests of Classic Kaplan Turbines (A. Adamkowski)
252.   2011-02-01 Turbine Survival Program (NWPCC)
253.   2011-02-27 Turbine Survival Program.pdf (NWPCC)
254.   2011-04-10 BPA  HOT  Agenda  Doc0.pdf
255.   2011-04-10 BPA HOT Agenda Doc1.pdf
256.   2011-04-10 BPA HOT Agenda Doc2.pdf
257.   2011-05-10 HOT Minutes basics, timeline and funding.pdf
257b. 2011-05-16_Letter_To_Judge_Redden_(Sheldon)

258.   2011-06-16 Hydro Optimization on the Columbia (Allen)
259.   2011-06-28 Email to Gary Fredricks.html
260.   2011-07-04 Email to GAO re Kaplan turbines and fish.html
261.   2011-08-19 Optimizing multi-unit-powerhouses-a-new-method (Parker et al)
262.   2011-08-29 ORNL Hydropower Asset Assessment Project (BSmith)
263.   2011-09-01 Determining the Best Methods for Reducing Fish Mortality (Cada, Amaral)
264.   2011-09-14 DOE FOIA BPA-2011-1861-F
265.   2011-10-01 AQFlow Flowmeter Test for PTC-18
266.   2011-10-06 BPA FOIA Response.html
267.   2011-11-02 Design Concept of Hydro Cascade Control System (V Fustek)
268.   2011-11-17 HOT Minutes.pdf
269.   2011-12-06 Best Practice Catalog-Propeller-Kaplan Turbine (ORNL)
270.   2012-01-01 GMS Study 2012 (Taylor, Proulx & Lampa)
271.   2012-01-01 Performance Testing 20SHP Stations in India (Dr. H.K. Verma)
272.   2012-03-01 Method to Develop Cam Curves from a Single Index Test (Sheldon)
273.   2012-06-27 Experimental Analysis of Optimal Cam For Kaplan Turbine
274.   2012-09-25 Northwest Hydro Operators Forum 2012 Fall Program (BPA)
275.   2012-12-01 BPA-2012-01066-FOIA Response.pdf
276.   2013-03-01 Real Time Performance Calculation (D.Q. Feng et al).pdf
277.   2013-05-21 HOT JOC Brief (BPA)
278.   2013-06-12 Optimizing Multi-Unit Powerhouses: Method to Compute Unit Selection and Load Sharing (Bass et al)
279.   2013-09-16 TVA Does not use Sliding Gate FOIA response email.html
280.   2013-11-01 Turbine Optimization for Passage of Juvenile Salmon (HDC).pdf
281.   2014-01-09 Selected Experiences with Optimization Tests of Kaplan Turbines (Adamkowski et al)
282.   2014-03-26 HOT Meeting Docs.pdf
283.   2014 Fall 8-Kaplan Kuhl Lai Lainel.pdf
284.   2014-12-29 FOIA Request Douglas Albright.pdf
285.   2015-01-05 BPA-2015-00456-FRequest.pdf
286.   2015-01-20 FOIA Extension.pdf
287.   2015-02-06 US Extends bidding for cavitation repair at 58MW Clarence Cannon Dam
288.   2015-04-06 HOT Agenda
289.   2015-04-06 HOT Minutes
290.   2015-05-19 Balancing Unit Efficiency and Fish Passage
291.   2015-06-18 JAG Brush-Off.pdf
292.   2015-10-20 RE Revisit the Automatic Index Test Box for Kaplan Turbines
293.   2016-01-01 Synopsis of HOT Meetings.htm
294.   2016-05-16 FOIA Response verified, collected and stored.
295.   2016-06-20 FOIA Appeal Denial
296.   2016-06-08 Frost Letter
297.   2016-07-20 FOIA Denial
298.   2017-05-03 2016-11-09 HOT Meeting-DRAFT-SUMMARY
299.   2016-11-09 HOT Meeting Agenda-draft (1)
300.   2016-11-09 HOT Meeting Agenda-draft (2)
301.   2017-01-16 Automatic Unattended Index Testing is Available Now.htm
302.   2017-02-11 Sheldon’s NEPA letter.pdf
303.   2017-02-24BPA-2017-00309-F-ReleaseandClosureLetter.zip
304.   2017-04-19 BPA-2017-01396-Binderof7pageswithRedactionsApplied.pdf
305.   2017-05-03 2016-11-09 HOT Meeting-DRAFT-SUMMARY.pdf
306.   2017-05-03 2016-11-09 HOT Meeting Agenda-draft (1).pdf
307.   2017-05-03 2016-11-09 HOT Meeting Agenda-draft (2).pdf
308.   2017-05-03 2016-11-09 HOT Team Actions Tab.pdf
309.   2017-05-03 2016-11-09 HOT Team Actions Tab 1 Current.pdf
310.   2017-05-03 2016-11-09 HOT Team Actions Tab 3 Sheet3.pdf
311.   2017-05-03 BPA-2017-00310-F-Albright-FOIA Records Release & Closure Follow-Up.html
312.   2017-05-03 BPA FOIA Closure Letter.pdf
313.   2017-05-03 Cover Letter.pdf
314.   2017-05-17 F-Albright Acknowledgment and Closure w No records Letter 051517.pdf
315.   2017-07-13 BPA FOIA Response.zip
316.   2017-09-01 BPA-2017-01396-F-AlbrightReleaseandClosureLetter090117.pdf
317.   2017-10-26 HOT Meeting DRAFT Agenda (1).pdf
318.   2017-10-26 HOT Meeting DRAFT Agenda (2).pdf
319.   2017-11-22 HOT Funding Memos
320.   2018-01-04 BPA-2017-00310-F-Albright-FOIA Records Release and Closure.html
321.   2017-02-11 Sheldon’s NEPA letter.pdf
322.   2018-04-09 Doug Albright FOIA Clarification.htm
323.   2018-05-01 How Adjusting Mechanical Governor Can Save $1 Million (Patla, Van Winkle and Parrish)
324.   2018-09-13 Power Cam Relationship (Voitenok et al)
325.   2019-03-25 Letter from HDC on GBO Status.html
326.   2019-03-25 Letter from HDC on GBO Status.pdf
327.   2019-05-14 Heather Breaks Contact $168.htm
328.   2019-05-20 1st FOIA No Data HDC.htm
329.   2019-08-28-FOIA Appeal BPA-2017-00310-F-Albright-FOIA.htm
330.   2020-01-03 BPA-2020-00255-F-Ackn. & Response
331.   2020-01-03 BPA-2020-00255-F Responsive Information
332.   2020-01-03 BPA-2020-00255-F FCRPS Plants
333.   2020-01-03 BPA-2020-00255-F Generation Data
334.   2020-01-03 BPA-2020-00255-F Revenue Data
335.   2020-02-21 Whistleblower protection RE Non-DoD Source FW Restart IG Complaint.htm
336.   2020-08-24 Iso-Power cam curve testing for optimal blades/wicket gates law for Kaplan Turbines (J. Cavalier)
337. 2021-01-11_Letter_to_James_Walsh_Chairman_of_ASME_PTC-18 Committee.htm
338.  
2020-09-20 Cost of Spill.xlsx
339.   2020-01-17 Synopsis of HOT   Meetings.htm
340.   Time Line of HOT and others.doc
341.   Time Line of HOT and others.htm
342.   Best Available Science
343.   McNary Video


Resources

1.     Advanced (Fish-Friendly) Hydropower Turbine Design Development -  Project 58.003 (EPRI)

2.     Alden Screw Turbine (Spring)

3.     Chem Info

4.     Conawingo Dam

5.     Constant Power Testing (Albright)

6.     Idaho National Laboratory Information Bridge - Hydropower Program: Advanced Turbine Systems (INL)

7.     Mica Dam, Columbia-Shuswap, BCV0A, Canada

8.     Northwest Power and Conservation Council Website

9.     Old Woodward.com

10. Optimization (Sheldon)

11. Pilot Valve Plate

12. PJM Power Dispatcher Primer, part-01

13. PJM Power Dispatcher Primer, part-02

14. W.A.C. Bennett Dam, Hudson's Hope, BCV0C, Canada

15. Water Turbines (Deriaz).pdf

16. Woodward History Page

17. Email to Senator Tammy Duckworth