Home

eference Materia

1.     1907-01-01 Water Power Engineering (Mead)
2.     1923-01-01 Hydro-Electric Power Stations (David Rushmore & Eric Lof)
3.     1929-09-02 Simple Basis for Securing Efficient Hydro Operation (F. Nagler)
4.     1933-04-01 Improved Type of Flow Meter for Hydraulic Turbines (I.A. Winter)
4a. Winter-Kennedy Tap Placement Principles

4b.      usbr.gov tech references
5.     1940-12-02 Turbine Efficiency At Safe Harbor (Mousson)
6.     2011-01-01 PTC-18 Credits Page
6b
2011-01-01 OCR from PTC-18 Credits Page
7.     1949-01-01 PTC-18 Index Test Supplement (ASME)
8.     1950-01-01 Hydroelectric Handbook (Creager, Justin)
9.     1951-01-01 Water Turbines excerpted from "Hydro-electric Engineering Practice (P.E. Deriaz)
10. 1953-12-03 Optimum Adjustment of Control Loops (Oldenburger)
11. 1954-01-01 Selecting Hydraulic Reaction Turbines (USBR)
12. 1954-01-11 Frequency Response Data Presentation Methods (Rufus Oldenberger)
13. 1955-07-01 Index Testing of Hydraulic Turbines (Voaden)
14. 1956-01-01 Speech notes (Voaden)
15. 1957-08-01 NEMA Code.pdf
16. 1958-09-01 Determination of WR^2 (NEMA)
17. 1961-02-01 The Instability of Stratified Flow (Mittendorf M.S. Thesis, State University of Iowa, available on loan)
18. 1963-05-01 Turbine Testing by the Gibson and Index Methods (USACE)
19. 1966-10-05 The Controlled System (M Leum)
20. 1967-12-01 Field Observations of Transient Servopressures In Kaplan Turbines (Mittendorf, Verna)
20b 1968-07-27_Index_Method_for_Pumping_Operation_of_Reverible_Pump-Turbine_(Yamabe,Yamaguchi)

21. 1970-07-08 Mark Invites George (Leum)
22. 1976-11-01 Viktor Kaplan: Life and Work (H. Häckert)
23. 1977-06-17 Analysis of PID Governors in MultiMachine Systems (Manitoba Hydro)
24. 1977-01-01 Estimating Reversible Pump Turbine Characteristics (USBR)
25. 1977-01-01 Development of the Kaplan Turbine (Hanns G. Hansson)
26. 1978-01-01 Woodward Rev-1 3-D Cam (WGC)
27. 1981-04-01 Governing Kaplan Turbines for Transient Loads
28. 1982-01-01 Field Testing Hydro Turbines (Lee Sheldon)
29. 1984-09-01 Measurement  of  Real-Time  Turbine  Efficiency  (Erickson, Graber)
30. 1985-04-26 ITB First Field Test (Albright)
31. 1985-09-18 Clarence Cannon Test Procedure (Sachs)
32. 1985-09-18 Clarence Cannon Test Report (Sachs)
33. 1986-01-14 BPA Seeking ITB Demonstration (Sheldon)
34. 1986-03-24 ITB Field Test Report (Albright)
35. 1986-03-26 ITB Detailed Field Test (Albright)
36. 1986-03-27 Report on Index Test box (Dave Bishoff)
37. 1986-04-01 Analysis of Clarence Cannon Data (Sheldon)
38. 1986-06-11 BPA to Corps (Myers)
39. 1986-07-03_Pitch_to_Idaho_Power_(Annotated).pdf
39b 1986-11-01 Checking Turbine Performance by Index Testing (Kirkland, Brice).pdf

40. 1987-03-01 Prime Times ITB
41. 1987-03-01 Prime Times T-700
42. Dr. Hook and his Medicine Show
43. 1987-06-01 Little Black Box for Index Testing (Albright)
44. 1987-07-01 Little Black Box (Albright) Ori
45. 1987-08-21 Optimization of Bulb and Kaplan Turbine Runners (B. Velensek)
46. 1987-09-01 PGE-PHP-2 Report (Gary Hackett)
47. 1987-12-01 PGE-PHP-2 Report (Terry Bauman)
48. 1987-12-04 Analysis of  Bull  Run  (Sheldon)
48b 1988-02-15 Bull Run Cam Comparison ITB-vs-Manual
49. 1988-05-28 PHP2 Classic Test (Sheldon)
49b. 1988-05-01 Comparison Report ITB to BPA Index test  
50. 1988-05-01 Kaplan Turbines: Design Trends (A. Lugarosi & A. Massa)
51. 1988-08-01 Index Testing (Steendahl)
52. 1988-08-01 Effect of Fish Diversion Screen on Turbine Efficiency (D. Lemon et al).pdf
53. 1988-12-27 U.S. Patent# 4,794,544 (Albright & George Mittendorf)
54. 1989-03-01 Prime Times ITB
55. 1989-08-01 Determining Turbine Efficiency by Index Testing Hydro Review Tech Briefs (Sheldon)
56. 1990-03-27 Evaluation of USACE's "automatic index testing device"  (Sheldon)
57. 1990-04-01 Woodward did not use ITB technology
58. 1990-04-01 History of USACE 3D Cam (various newspaper clips)
59. 1991-01-01 IEC-41 Index Testing Winter Kennedy
60. 1991-06-01 Effects of Hydroelectric Turbine Passage on Fish Early Life Stages (Cada)
61. 1993-01-01 Modern Errors in Winter Kennedy (Sheldon)
62. 1995-01-01 Opt-Ease Brochure (Sheldon)
63. 1995-01-01 Optimization Efficiency of Multi unit Hydro Plants (Sheldon)
64. 1995-04-18 Turbine passage survival estimation for chinook salmon smolts (Oncorhynchus tshawytscha) at a large dam on the Columbia River (Mathur, Heisey, Euston, Skalski and Hays)
65. 1995-08-25 Joint  Load  Optimization  (Dave  Kornegay)
66. 1995-10-27 21st Century Advanced Hydropower Turbine System (Brookshire et. al.)
67. 1996-01-01 IGHEM Montreal Experience at Index Testing.pdf 
68. 1997-01-01 U.S. Hydropower Resource Assessment for Illinois (Reinhart et al)
69. 1997-07-01 Diagnostic Evaluation of Turbine Efficiency Profiles and data (Sheldon)
70. 1009-10-01 downstream Passage for Salmon at Hydroelectric Projects in the Columbia River Basin: Development, Installation and Evaluation (Whitney, Calvin, Erho & Coutant)
71. 1996-10-10 Fish passage mitigation of impacts from hydroelectric power projects in the US (Cada)
72. 1997-03-06 Shaken Not  Stirred  Recipe  for  Fish-Friendly  Turbine (Cada)
73. 1997-03-01 Development of Biological Criteria for the Design of Advanced Hydropower Turbines (Cada, Coutant)
74. 1997-05-01 Sliding  Gate  Method  (Almquist, March & Franseen)
75. (2013-01-01 Late Note: A FOIA for Sliding Gate data learned it didn't work.)
76. 1998-01-01 Measuring the effect of Fish Diversion Screens (Lemon, Wittinger et al)
77. 1998-06-01 Reviewing the Approaches to Hydro Optimization (Sheldon)
78. 1999-07-01 Summary of Environmentally Friendly Turbine Design Concepts (Odeh)
79. 1999-08-10 The Infinite Turbine (Janet Wood)
80. 1999-08-10 Water Power Magazine The Infinite Turbine (Wood)
81. 1999-12-01 It's Not Easy Being Green (March, Fisher).pdf
82. 1999-01-01 Status of U.S. Department  Of  Energy's  Advanced  Hydropower  Turbine  Systems  Program  (Sale, Cada, Reinhart, Sommers, Brookshier, Flynn)
83. 2000-04-01 Tools for Environmental Monitoring and Response at Hydro Projects (Faulkner)
84. 2000-04-25 Hydropower R&D: Recent Advances in Turbine Passage Technology (Brookshire, Reinhart, Cada)
85. 2000-04-01 Tools for Hydro Environmental Monitoring (Faulkner)
86. 2000-12-04 BPA Completes GDACS @ McNary (BPA)
87. 2001-01-01 Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Powerhouse 1 (Carlson)
88. 2001-06-16 Voith Siemens Hydro Power Generation (Richard Fisher VS-Hydro to NPCC)
89. 2001-09-01 Development of Advanced Hydroelectric Turbines to Improve Fish Passage Survival (Cada et. al.)
90. 2001-12-01 HydroPower in Norway TitlePage.pdf
91. 2001-12-01 Blanket Contract and Sole Source Justification.htm
92. 2001-12-01 Hydropower in Norway Mechanical Equipment (Arne Kjolle)
94. 2002-04-01 Tools  For  Environmental  Monitoring  and  Response  at  Hydro  Projects
95. 2002-01-01 Application of Biological Design Criteria in Kaplan turbines. (ORNL)
96. 2003-02-06 ATECo Quote to Lee Sheldon at HDC (Albright)
97. 2003-03-01 Evolution of Sensor Fish Device for Measuring Physical Conditions in Severe Hydraulic Environments (T.J.Carlson et al)
98. 2003-03-01 Regulatory Approaches for Dissolved Oxygen at Hydropower Facilities (ORNL Peterson et. al.)
98b 2003-06_N-Link_Proposal_to_acquire_ITB_PowerPoint_slides.pdf

99. 2003-08-01 Optimizing the Corps Hydroelectric Generation on the Columbia River (Wittinger)
100. 2003-08-07 ITB Cost Estimate (Wittinger)
101. 2003-08-07 ATECo Sole Source Justification (Wittinger)
102. 2003-08-29 ITB Scope of Work (Roll, Wittinger)
103. 2003-09-01 Identifying Effects on Fish of Pressure Changes during Turbine Passage (Abernathy, Becker & Dauble)
104. 2003-09-01 ITB Project Specification.htm
105. 2003-09-06 USACE ITB Solicitation #1 (HDC)
106. 2003-09-12 USACE ITB Solicitation #2 (HDC)
107. 2003-10-20 Software Report (ATECo)
108. 2003-10-20 Screen Gallery (ATECo)
109.  2003-10-24 AGCo Claims ITB.pdf
110.  2003-12-27 Woodward's Patent Expires
111.  2004-05-26 USACE Contract W9127N-04-D-0009 for Type-1 Optimizer (Ebner)
112.  2004-05-26 USACE Contract Special License Agreement (Ebner)
113.  2004-07-19 TX 6-006-161 ITB Software Copyright  (Albright)
114.  2004-07-01 Six-Degree of Freedom Sensor Fish Design (Deng et. al.)
115.  2004-07-29 Turbine Data Request.pdf
116.  2004-10-12 Pre-Stop Work Memo.pdf
116b 2004-10-14_Unclear.pdf
117.  2004-10-14 Stop Work Memo and causes.htm
118.  2004-10-28 HOT Minutes.pdf
119.  2004-11-02 ANSI IEEE Std-1207 Excerpt (IEEE)
120.  2005-04-15 Hydro Turbine Optimization
121.  2005-04-22 T1 future.pdf
122.  2005-04-25 Modification to 3D Cam Function Needed for ITB (Miska)
122b 2005-05-05 Executive Brief delineating the Optimization Suite.pdf
122c High_Voltage_Brief
123.  2005-05-18 ACSI McNary GDACS Reconfigure for ITB
124.  2005-06-01 Kaplan cam tuning procedure by Aleksandar Gajic et al.pdf
125.  2005-06-01 Draft Best Practices WPXIV Hydro Performance Processes R8 (March et al)
126.  2005-06-08 04-D-0009-P00001 Ed as PM TL&POC.pdf
127.  2005-06-22 What Ed Miska Directed Me to Remove from the ITB Rev1 br4.pdf
127b 2005-07-14 Good News No Zero problem.pdf
128. 2005-07-26 Amendment of Solicitation/Modification of Contract.pdf
 

129.  2005-08-03 HDC explains zero problem.pdf
129b 2005-08-05 T1 Coordination Meeting (Miska).pdf

130.  2005-08-11 ITB Project Interim Status Report.doc
130b 2005-08-11_T1_Options_Given_a_DOA_ATE-150_Box_(Miska)

131.  2005-09-01 PIER Research on Fish Passage at California Hydropower (CA Energy Commission Staff).pdf
132.  2005-09-15 ITB Manual to Rod.html 
132b 2005-10-06 ITB Project Interim Status Report.pdf

133.  2005-11-01 Evaluation of Blade-Strike Models of Kaplan Turbines (PNNL)
134.  2005-11-27 ITB Manual to Rod.html
135.  2005-11-30 Zeroing Out the Messenger (Harden).htm
136.  2005-12-05 T1 Bench Testing MFR.pdf
137.  2005-12-07 Tech info to HDC
138.  2005-12-12 McNary Field Test (Wittinger)
139.  2005-12-14 T1 Test Log.htm
140.  2005-12-15 Unit 9 3-D cam W Screens.jpg
141.  2005-12-16 ITB Field Test Data Report.pdf
142.  2005-12-16 Bad Program Icon.pdf
143.  2005-12-30 McNary Unit-9 Index Test.html
144.  2006-01-16 McNary Field Test (Albright)
145.  2006-01-16 ITB McNary Field Test.html
146.  2006-01-17 haggling prices with Ebner
147.  2006-01-23 List of Fixes before Ice Harbor Test.pdf
148.  2006-01-25 ITB Price to COE.html
149.  2006-01-25 HOT Minutes.htm
150.  2006-01-25 ITB Price to COE.html
151.  2006-01-25 HOT Meeting ITB Project Status.ppt (BPA)
152.  2006-01-25 Ed wants to kill ITB project in favor of a project for him
153.  2006-01-26 Ed Has Conflict of Interest
154.  2006-02-17 Ice Harbor Data and Analysis.pdf
155.  2006-02-18 Kootenai River Letter from USDOI to USACE HDC and DOE BPA.html
156.  2006-02-21 Ice Harbor Field Test (Ramirez)
157.  2006-02-01 Ice Harbor data (Ramirez)
158.  2006-03-01
.ppt

159.  2006-03-01 Pg14 ITB Code Running On GDACS.jpg
160.  2006-03-01 Dan R Update on ITB Status.htm
161.  2006-03-03 HOT PPT Page 3.JPG
162.  2006-03-03 HOT Meeting PowerPoint (HDC).htm
163.  2006-03-03 HOT Powerpoint.pdf
164.  2006-03-03 HOT PPT all.jpg
165.  2006-03-03 HOT PPT Page 1.JPG
166.   2006-03-03 HOT PPT Page 2.JPG
167.   2006-03-03 HOT PPT Page 3.JPG
168.   2006-03-22 IEEE 1147-2005 2006-03-22 Rehab powerplants.pdf
169.   2006-03-28 ATECo Ice Harbor Analysis
170.   2006-04-01 Performance Period TimeLine (ATECo)
171.   2006-04-01 T1 FY06 Plan and Beyond (HDC)
172.   2006-04-24 BPA to Corps with ppt (Murphy)
173.   2006-05-23 HOT Minutes.pdf
174.   2006-06-01 Effects of Turbine Passage on Salmon at Wanapum (Cada et al) 
175.   2006-06-01 Improving Operations on The Columbia (Murphy)
176.   2006-06-01 Efforts to reduce mortality to Hydroelectric Turbine-Passed fish (Cada et al)
177.   2006-06-06 Must give name.pdf
178.   2006-06-08 Contract In-House for ITB.html
179.   2006-06-13 CID Report FA14-2035.pdf
180.   2006-06-29 BPA Review of Contract (Jones).pdf
181.    2006-07-01 Index Test Box Final Report uncirculated (Sheldon)
182.   2006-07-31 Optimizing Dam Operations for Power and Fish (USACE, DOE)
183.   2006-08-01 Kaplan Example (Hydro Performance Processes)
184.   2006-08-11 One Pager.pdf
184b 2006-08-12 McNary Trip Notes (Miska).pdf

185.   2006-08-13 Hydro Review excerpt USACE contract AGCo.jpg
186.   2006-09-03 BPA HOT Contracting Difficulties.htm
187.   2006-09-12 HOT Minutes.htm
188.   2006-09-12 PowerPoint Reccomendations.pdf
189.   2006-09-01 Reduced Spill at Hydropower Dams (Coutant et al)
190.   2006-09-01 Index Test Box Final Report from HDC to HOT (Sheldon)
191.   2006-09-19 WSJ fish kill (Fialca)
192.   2006-09-29 A new Graphical Method to Reduce Turbine Index Test Data (Sheldon)
193.   2006-10-06 blade spiral.htm
194.   2007-07-01 Sensorfish-07-03399.pdf
195.   2007-01-04 HDC Job Solicitation.pdf
196.   2008-01-03 FOIA Cover Letter (no other ITB contract).pdf]
197. 2007-01-23 HOT Minutes No Longer Called Index Test Box.htm
198.   2007-01-30 Very Simple Kaplan Turbine Design (Ingram)
199.   2007-03-11 3-D Cam and Blade Survey Part-1.pdf
200.   2007-03-11 3-D Cam and Blade Survey Part-2.pdf

201.   2007-05-16 HOT Meeting Minutes.pdf   HDC Pitch T1 box (or Gate Blade Optimizer)
202.   2007-07-01 DOE Hydropower Program Biennial Report for FY 2005-2006
203.   2007-07-02 T1Data Gathering Device.htm
204.  2007-08-01 Biological Assessment of the Advanced Turbine Design at Wanapum Dam, 2005 (Dauble et al)
205.  2007-08-06 DOE IG Whistleblower referral FOIA Denial
206.  2007-08-14 HOT Minutes.pdf GBO Report Automatic Flushing system program, Blade-Gate Controller (BGO) pitch GBO Verification
207.  2007-09-11 Manzullo to GSA
208.  2007-11-01 Determining the Effect of Shear Stress on Fish Mortality during Turbine Passage (Cada et al)
209.  2007-11-07 General Martin moves on.html
210.  2007-12-06 HOT Minutes.htm T1 Perturbation, T2 and  Flushing system
211.  2008-01-01 Northwest Hydro Operators Forum (BPA)
212.  2008-01-03 FOIA Cover Letter (no other ITB contract).pdf
213.  2008-02-08 HDC FOIA Response.pdf
214.  2008-03-01 Optimization of Hydro Power Plants (Cateni et al)
215.  2008-03-03 Letter to BPA HOT Committee.pdf
216.  2008-03-04 Pre-HOT Meeting announcement.jpg
217.   2008-03-11 HOT Minutes.pdf Dan R, abbreviated surveys, HDC 3-D Cam Operational tests, Hard Cams, T1 Roadmap
218.   2008-03-25 DOE IG Waste of funds.pdf
219.   2008-05-05 NOAA Fisheries Biological Opinion Executive Summary.pdf
220.   2008-06-01 Testing Time for Kaplans (Albright)
221.   2008-06-13 Digital Governor Solicitation (HDC)
222.   2008-06-13 Hydro Review AGCo Contract Award.html
223.  2008-07-06 Optimizing Generating Efficiency of Entire Powerhouses (Sheldon)
224.   2008-06-17 NW-Hydro Operators Forum (Murphy)
225.  2008-06-24 Winter  Kennedy  Flushing Solicitation for McNary W9127N-08-Q-0076
226.  2008-08-03 IGHEM Italy Turbine Upgrade Efficiency (Aldo Cateni et al)
227.   2008-09-01 Award in Reno (Sheldon pg-13).pdf
228.   2008-10-02 HOT Meeting
229.   2008-10-03 HOT Meeting (annotated)
230.   2008-12-01 Iron Gate Dam Turbine Performance Air Admission Tests.pdf
231.   2009-06-10 W9127N04D0009 Contract Evaluation.htm
232.   2009-06-12 Contract Evaluation.htm
233.   2009-06-14 Letter to Steven Wright at BPA (Albright)
234.   2009-06-15 W9127N04D0009 Contract Evaluation.doc
235.   2009-06-15 W9127N04D0009Contract Evaluation Brief.doc
236.   2009-06-15 IG letter about Contract evaluation.html
237.   2009-08-14 Numerical Prediction of Vortex Rope in the Draft Tube (Lipej)
238.   2009-08-21 USACE Contract closing memorandum.pdf
239.   2009-09-04 ATECo Response.htm
240.   2009-10-21 HOT Mtg FOIA T1 at Chief Joseph Dam
241.   2009-12-01 Performance Testing of SHP Stations (Government of India)
242.   2010-01-10 Reish Letter.html
243.   2010-04-19 HOT Meeting Minutes (BPA) 
244.   2010-07-01 Efficiency Testing-New Method to Determine Turbine Absolute Flow and Absolute Efficiency Data (Sheldon).htm
245.   2010-08-06 BPA Hot Meeting Minutes.pdf
246.   2010-09-17 DOE Information Letter (Albright)
247.   2010-09-21 ITB Product Description.htm
248.   2010-10-21 Gate Blade Optimizer Status - promises made.pdf
249.   2010-10-23 Improved WK Calibration Method (D.R. Topham)
250.   2010-10-23 Kaplan Optimization
251.   2011-01-31 Optimization Tests of Classic Kaplan Turbines (A. Adamkowski)
252.   2011-02-01 Turbine Survival Program (NWPCC)
253.   2011-02-27 Turbine Survival Program.pdf (NWPCC)
254.   2011-04-10 BPA  HOT  Agenda  Doc0.pdf
255.   2011-04-10 BPA HOT Agenda Doc1.pdf
256.   2011-04-10 BPA HOT Agenda Doc2.pdf
257.   2011-05-10 HOT Minutes basics, timeline and funding.pdf
257b. 2011-05-16_Letter_To_Judge_Redden_(Sheldon)

258.   2011-06-16 Hydro Optimization on the Columbia (Allen)
259.   2011-06-28 Email to Gary Fredricks.html
260.   2011-07-04 Email to GAO re Kaplan turbines and fish.html
261.   2011-08-19 Optimizing multi-unit-powerhouses-a-new-method (Parker et al)
262.   2011-08-29 ORNL Hydropower Asset Assessment Project (BSmith)
263.   2011-09-01 Determining the Best Methods for Reducing Fish Mortality (Cada, Amaral)
264.   2011-09-14 DOE FOIA BPA-2011-1861-F
265.   2011-10-01 AQFlow Flowmeter Test for PTC-18
266.   2011-10-06 BPA FOIA Response.html
267.   2011-11-02 Design Concept of Hydro Cascade Control System (V Fustek)
268.   2011-11-17 HOT Minutes.pdf
269.   2011-12-06 Best Practice Catalog-Propeller-Kaplan Turbine (ORNL)
270.   2012-01-01 GMS Study 2012 (Taylor, Proulx & Lampa)
271.   2012-01-01 Performance Testing 20SHP Stations in India (Dr. H.K. Verma)
272.   2012-03-01 Method to Develop Cam Curves from a Single Index Test (Sheldon)
273.   2012-06-27 Experimental Analysis of Optimal Cam For Kaplan Turbine
274.   2012-09-25 Northwest Hydro Operators Forum 2012 Fall Program (BPA)
275.   2012-12-01 BPA-2012-01066-FOIA Response.pdf
276.   2013-03-01 Real Time Performance Calculation (D.Q. Feng et al).pdf
277.   2013-05-21 HOT JOC Brief (BPA)
278.   2013-06-12 Optimizing Multi-Unit Powerhouses: Method to Compute Unit Selection and Load Sharing (Bass et al)
279.   2013-09-16 TVA Does not use Sliding Gate FOIA response email.html
280.   2013-11-01 Turbine Optimization for Passage of Juvenile Salmon (HDC).pdf
281.   2014-01-09 Selected Experiences with Optimization Tests of Kaplan Turbines (Adamkowski et al)
282.   2014-03-26 HOT Meeting Docs.pdf
283.   2014 Fall 8-Kaplan Kuhl Lai Lainel.pdf
284.   2014-12-29 FOIA Request Douglas Albright.pdf
285.   2015-01-05 BPA-2015-00456-FRequest.pdf
286.   2015-01-20 FOIA Extension.pdf
287.   2015-02-06 US Extends bidding for cavitation repair at 58MW Clarence Cannon Dam
288.   2015-04-06 HOT Agenda
289.   2015-04-06 HOT Minutes
290.   2015-05-19 Balancing Unit Efficiency and Fish Passage
291.   2015-06-18 JAG Brush-Off.pdf
291b 2015-07-28 Original Email to HR

292.   2015-10-20 RE Revisit the Automatic Index Test Box for Kaplan Turbines
293.   2016-01-01 Synopsis of HOT Meetings.htm
294.   2016-05-16 FOIA Response verified, collected and stored.
295.   2016-06-20 FOIA Appeal Denial
296.   2016-06-08 Frost Letter
297.   2016-07-20 FOIA Denial
298.   2017-05-03 2016-11-09 HOT Meeting-DRAFT-SUMMARY
299.   2016-11-09 HOT Meeting Agenda-draft (1)
300.   2016-11-09 HOT Meeting Agenda-draft (2)
301.   2017-01-16 Automatic Unattended Index Testing is Available Now.htm
302.   2017-02-11 Sheldon’s NEPA letter.pdf
303.   2017-02-24BPA-2017-00309-F-ReleaseandClosureLetter.zip
304.   2017-04-19 BPA-2017-01396-Binderof7pageswithRedactionsApplied.pdf
305.   2017-05-03 2016-11-09 HOT Meeting-DRAFT-SUMMARY.pdf
306.   2017-05-03 2016-11-09 HOT Meeting Agenda-draft (1).pdf
307.   2017-05-03 2016-11-09 HOT Meeting Agenda-draft (2).pdf
308.   2017-05-03 2016-11-09 HOT Team Actions Tab.pdf
309.   2017-05-03 2016-11-09 HOT Team Actions Tab 1 Current.pdf
310.   2017-05-03 2016-11-09 HOT Team Actions Tab 3 Sheet3.pdf
311.   2017-05-03 BPA-2017-00310-F-Albright-FOIA Records Release & Closure Follow-Up.html
312.   2017-05-03 BPA FOIA Closure Letter.pdf
313.   2017-05-03 Cover Letter.pdf
314.   2017-05-17 F-Albright Acknowledgment and Closure w No records Letter 051517.pdf
315.   2017-07-13 BPA FOIA Response.zip
316.   2017-09-01 BPA-2017-01396-F-AlbrightReleaseandClosureLetter090117.pdf
317.   2017-10-26 HOT Meeting DRAFT Agenda (1).pdf
318.   2017-10-26 HOT Meeting DRAFT Agenda (2).pdf
319.   2017-11-22 HOT Funding Memos
320.   2018-01-04 BPA-2017-00310-F-Albright-FOIA Records Release and Closure.html
321.   2017-02-11 Sheldon’s NEPA letter.pdf
322.   2018-04-09 Doug Albright FOIA Clarification.htm
323.   2018-05-01 How Adjusting Mechanical Governor Can Save $1 Million (Patla, Van Winkle and Parrish)
324.   2018-09-13 Power Cam Relationship (Voitenok et al)
325.   2019-03-25 Letter from HDC on GBO Status.html
326.   2019-03-25 Letter from HDC on GBO Status.pdf
326b 2019-04-01 Optimizing Kaplan Turbine Efficiency with Minimal Cost, Effort and Time (Sheldon)

327.   2019-05-14 Heather Breaks Contact $168.htm
328.   2019-05-20 1st FOIA No Data HDC.htm
329.   2019-08-28-FOIA Appeal BPA-2017-00310-F-Albright-FOIA.htm
330.   2020-01-03 BPA-2020-00255-F-Ackn. & Response
331.   2020-01-03 BPA-2020-00255-F Responsive Information
332.   2020-01-03 BPA-2020-00255-F FCRPS Plants
333.   2020-01-03 BPA-2020-00255-F Generation Data
334.   2020-01-03 BPA-2020-00255-F Revenue Data
335.   2020-02-21 Whistleblower protection RE Non-DoD Source FW Restart IG Complaint.htm
336.   2020-08-24 Iso-Power cam curve testing for optimal blades/wicket gates law for Kaplan Turbines (J. Cavalier)
337. 2021-01-11_Letter_to_James_Walsh_Chairman_of_ASME_PTC-18 Committee.htm
338.  
2020-09-20 Cost of Spill.xlsx
339.   2020-01-17 Synopsis of HOT   Meetings.htm
340.   Time Line of HOT and others.doc
341.   Time Line of HOT and others.htm
342.   Best Available Science
343.   McNary Video


Resources

1.     Advanced (Fish-Friendly) Hydropower Turbine Design Development -  Project 58.003 (EPRI)

2.     Alden Screw Turbine (Spring)

3.     Chem Info

4.     Conawingo Dam

5.     Constant Power Testing (Albright)

6.     Idaho National Laboratory Information Bridge - Hydropower Program: Advanced Turbine Systems (INL)

7.     Mica Dam, Columbia-Shuswap, BCV0A, Canada

8.     Northwest Power and Conservation Council Website

9.     Old Woodward.com

10. Optimization (Sheldon)

11. Pilot Valve Plate

12. PJM Power Dispatcher Primer, part-01

13. PJM Power Dispatcher Primer, part-02

14. W.A.C. Bennett Dam, Hudson's Hope, BCV0C, Canada

15. Water Turbines (Deriaz).pdf

16. Woodward History Page

17. Email to Senator Tammy Duckworth

Lee Resume

Lee Obit

Dave Resume

Dave Obit

George Obit

How high is High-Voltage?








style="color: windowtext; text-decoration: none;">
Description: Description: Description: free counters