eference Materia
1.
1907-01-01 Water Power Engineering (Mead) 2.
1923-01-01
Hydro-Electric Power Stations (David Rushmore & Eric Lof)3.
1929-09-02
Simple Basis for Securing Efficient Hydro Operation (F. Nagler)4.
1933-04-01
Improved Type of Flow Meter for Hydraulic Turbines (I.A. Winter)a.
usbr.gov tech references5.
1940-12-02 Turbine Efficiency At Safe
Harbor (Mousson)6.
2011-01-01
PTC-18 Credits Page7.
1949-01-01 PTC-18 Index Test Supplement (ASME)8.
1950-01-01 Hydroelectric Handbook (Creager, Justin)9.
1951-01-01 Water Turbines excerpted from "Hydro-electric
Engineering Practice (P.E. Deriaz)
10.
1953-12-03 Optimum Adjustment of Control Loops (Oldenburger)
11.
1954-01-01 Selecting Hydraulic Reaction Turbines (USBR)12.
1954-01-11 Frequency Response Data Presentation Methods (Rufus
Oldenberger)13.
1955-07-01 Index Testing of Hydraulic Turbines (Voaden)14.
1956-01-01 Speech notes (Voaden)15.
1957-08-01
NEMA Code.pdf16.
1958-09-01 Determination of WR^2 (NEMA)17. 1961-02-01
The Instability of Stratified Flow (Mittendorf M.S. Thesis, State University of
Iowa, available on loan)18.
1963-05-01 Turbine Testing by the Gibson and Index Methods
(USACE)19.
1966-10-05 The Controlled System (M Leum)20.
1967-12-01 Field Observations of Transient Servopressures In
Kaplan Turbines (Mittendorf, Verna)21.
1970-07-08
Mark Invites George (Leum)22.
1976-11-01
Viktor Kaplan: Life and Work (H. Häckert)23.
1977-06-17 Analysis of PID Governors in MultiMachine
Systems (Manitoba Hydro)24.
1977-01-01 Estimating Reversible Pump Turbine
Characteristics (USBR)25.
1977-01-01 Development of the Kaplan Turbine (Hanns G. Hansson)26.
1978-01-01
Woodward Rev-1 3-D Cam (WGC)27.
1981-04-01 Governing Kaplan Turbines for Transient Loads28. 1982-01-01 Field Testing Hydro Turbines
(Lee Sheldon)29.
1984-09-01 Measurement of
Real-Time Turbine Efficiency (Erickson, Graber)30.
1985-04-26 ITB First Field Test
(Albright)31. 1985-09-18 Clarence Cannon Test Procedure (Sachs)32. 1985-09-18 Clarence Cannon Test Report (Sachs)33.
1986-01-14 BPA Seeking ITB Demonstration (Sheldon)34. 1986-03-24
ITB Field Test Report (Albright)35.
1986-03-26
ITB Detailed Field Test (Albright)36.
1986-03-27
Report on Index Test box (Dave Bishoff)37.
1986-04-01
Analysis of Clarence Cannon Data (Sheldon)38. 1986-06-11 BPA to Corps
(Myers)39.
1986-11-01
Checking Turbine Performance by Index Testing (Kirkland, Brice).pdf40. 1987-03-01 Prime
Times ITB41. 1987-03-01 Prime Times T-70042.
Dr. Hook and his Medicine Show43. 1987-06-01 Little Black Box
for Index Testing (Albright)44.
1987-07-01
Little Blade Box (Albright) Ori45.
1987-08-21 Optimization of Bulb and Kaplan Turbine
Runners (B. Velensek)46.
1987-09-01 PGE-PHP-2 Report (Gary
Hackett)47. 1987-12-01 PGE-PHP-2 Report
(Terry Bauman)48.
1987-12-04
Analysis of Bull Run (Sheldon)49. 1988-05-28 PHP2 Classic Test (Sheldon)
49b. 1988-05-01 Comparison Report ITB to BPA Index test
50.
1988-05-01 Kaplan Turbines:
Design Trends (A. Lugarosi & A. Massa)51. 1988-08-01 Index Testing
(Steendahl)52. 1988-08-01 Effect of Fish Diversion Screen on Turbine
Efficiency (D. Lemon et al).pdf53. 1988-12-27 U.S. Patent# 4,794,544 (Albright & George
Mittendorf)54.
1989-03-01
Prime Times ITB55.
1989-08-01 Determining Turbine Efficiency by Index Testing Hydro
Review Tech Briefs (Sheldon)56.
1990-03-27
Evaluation of USACE's "automatic index testing device"
(Sheldon)57.
1990-04-01
Woodward did not use ITB technology58.
1990-04-01
History of USACE 3D Cam (various newspaper clips)59.
1991-01-01
IEC-41 Index Testing Winter Kennedy60. 1991-06-01 Effects of Hydroelectric
Turbine Passage on Fish Early Life Stages (Cada)61. 1993-01-01
Modern Errors in Winter Kennedy (Sheldon)62.
1995-01-01
Opt-Ease Brochure (Sheldon)63.
1995-01-01
Optimization Efficiency of Multi unit Hydro Plants (Sheldon)64. 1995-04-18 Turbine
passage survival estimation for chinook salmon smolts (Oncorhynchus
tshawytscha) at a large dam on the Columbia River (Mathur, Heisey, Euston,
Skalski and Hays)65.
1995-08-25 Joint Load
Optimization (Dave Kornegay)66.
1995-10-27
21st Century Advanced Hydropower Turbine System (Brookshire et. al.)67.
1996-01-01
IGHEM Montreal Experience at Index Testing.pdf 68.
1997-01-01 U.S. Hydropower
Resource Assessment for Illinois (Reinhart et al)69.
1997-07-01
Diagnostic Evaluation of Turbine Efficiency Profiles and data (Sheldon)70.
1009-10-01
downstream Passage for Salmon at Hydroelectric Projects in the Columbia River
Basin: Development, Installation and Evaluation (Whitney, Calvin, Erho &
Coutant)71.
1996-10-10
Fish passage mitigation of impacts from hydroelectric power projects in the US
(Cada)72.
1997-03-06 Shaken Not Stirred
Recipe for Fish-Friendly Turbine (Cada)73.
1997-03-01 Development of
Biological Criteria for the Design of Advanced Hydropower Turbines (Cada,
Coutant)74.
1997-05-01 Sliding Gate
Method (Almquist, March & Franseen)75.
(2013-01-01 Late Note: A FOIA for Sliding Gate data learned it
didn't work.)76.
1998-01-01
Measuring the effect of Fish Diversion Screens (Lemon, Wittinger et al)77.
1998-06-01
Reviewing the Approaches to Hydro Optimization (Sheldon)78.
1999-07-01 Summary of
Environmentally Friendly Turbine Design Concepts (Odeh)79.
1999-08-10
The Infinite Turbine (Janet Wood)80.
1999-08-10
Water Power Magazine The Infinite Turbine (Wood)81.
1999-12-01
It's Not Easy Being Green (March, Fisher).pdf82.
1999-01-01 Status of U.S. Department Of Energy's Advanced
Hydropower Turbine Systems Program (Sale, Cada,
Reinhart, Sommers, Brookshier, Flynn)83.
2000-04-01
Tools for Environmental Monitoring and Response at Hydro Projects (Faulkner)84.
2000-04-25
Hydropower R&D: Recent Advances in Turbine Passage Technology (Brookshire,
Reinhart, Cada)85.
2000-04-01
Tools for Hydro Environmental Monitoring (Faulkner)86.
2000-12-04
BPA Completes GDACS @ McNary (BPA)87.
2001-01-01
Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap
Runner Turbine Design at Bonneville Powerhouse 1 (Carlson)88.
2001-06-16
Voith Siemens Hydro Power Generation (Richard Fisher VS-Hydro to NPCC)89.
2001-09-01 Development of
Advanced Hydroelectric Turbines to Improve Fish Passage Survival (Cada et. al.)90.
2001-12-01
HydroPower in Norway TitlePage.pdf91.
2001-12-01 Blanket Contract and Sole Source Justification.htm92.
2001-12-01
Hydropower in Norway Mechanical Equipment (Arne Kjolle)94.
2002-04-01
Tools For Environmental
Monitoring and Response at Hydro Projects95.
2002-01-01 Application of Biological Design Criteria in Kaplan
turbines. (ORNL)96.
2003-02-06
ATECo Quote to Lee Sheldon at HDC (Albright)97.
2003-03-01
Evolution of Sensor Fish Device for Measuring Physical Conditions
in Severe Hydraulic Environments (T.J.Carlson et al)98.
2003-03-01 Regulatory
Approaches for Dissolved Oxygen at Hydropower Facilities (ORNL
Peterson et. al.)99. 2003-08-01
Optimizing the Corps Hydroelectric Generation on the Columbia River (Wittinger)100. 2003-08-07 ITB Cost
Estimate (Wittinger)101.
2003-08-07 ATECo Sole Source Justification (Wittinger)102.
2003-08-29 ITB Scope of Work (Roll, Wittinger)103.
2003-09-01
Identifying Effects on Fish of Pressure Changes during Turbine Passage
(Abernathy, Becker & Dauble)104. 2003-09-01
ITB Project Specification.htm105.
2003-09-06
USACE ITB Solicitation #1 (HDC)106.
2003-09-12
USACE ITB Solicitation #2 (HDC)107.
2003-10-20
Software Report (ATECo)108.
2003-10-20
Screen Gallery (ATECo)109.
2003-10-24 AGCo Claims ITB.pdf110. 2003-12-27 Woodward's Patent Expires111.
2004-05-26
USACE Contract W9127N-04-D-0009 for Type-1 Optimizer (Ebner)112. 2004-05-26
USACE Contract Special License Agreement (Ebner)113.
2004-07-19 TX 6-006-161 ITB Software Copyright
(Albright)114.
2004-07-01
Six-Degree of Freedom Sensor Fish Design (Deng et. al.)115.
2004-07-29 Turbine Data Request.pdf116.
2004-10-12
Pre-Stop Work Memo.pdf117.
2004-10-14 Stop
Work Memo and causes.htm118.
2004-10-28 HOT Minutes.pdf119.
2004-11-02
ANSI IEEE Std-1207 Excerpt (IEEE)120.
2005-04-15 Hydro Turbine Optimization 121.
2005-04-22 T1 future.pdf122.
2005-04-25 Modification to 3D Cam Function Needed for ITB
(Miska)123.
2005-05-18
ACSI McNary GDACS Reconfigure for ITB124.
2005-06-01 Kaplan cam
tuning procedure by Aleksandar Gajic et al.pdf125.
2005-06-01 Draft Best Practices WPXIV Hydro Performance
Processes R8 (March et al)126. 2005-06-08
04-D-0009-P00001 Ed as PM TL&POC.pdf127. 2005-06-22 What Ed Miska Directed Me to Remove from the
ITB Rev1 br4.pdf128.
2005-07-14 Good
News No Zero problem.pdf129. 2005-08-03 HDC
explains zero problem.pdf130. 2005-08-11
ITB Project Interim Status Report.doc131.
2005-09-01
PIER Research on Fish Passage at California Hydropower (CA Energy Commission
Staff).pdf132.
2005-09-15
ITB Manual to Rod.html 133.
2005-11-01
Evaluation of Blade-Strike Models of Kaplan Turbines (PNNL)134.
2005-11-27 ITB Manual
to Rod.html135.
2005-11-30 Zeroing Out the Messenger (Harden).htm136.
2005-12-05 T1
Bench Testing MFR.pdf137.
2005-12-07 Tech info
to HDC138.
2005-12-12 McNary Field Test (Wittinger)139.
2005-12-14
T1 Test Log.htm140.
2005-12-15 Unit 9 3-D cam W Screens.jpg141.
2005-12-16 ITB Field Test Data Report.pdf142.
2005-12-16
Bad Program Icon.pdf143.
2005-12-30
McNary Unit-9 Index Test.html144.
2006-01-16
McNary Field Test (Albright)145.
2006-01-16 ITB McNary Field Test.html146.
2006-01-17
haggling prices with Ebner147.
2006-01-23
List of Fixes before Ice Harbor Test.pdf148.
2006-01-25 ITB Price to
COE.html149.
2006-01-25 HOT Minutes.htm150.
2006-01-25 ITB Price to
COE.html151. 2006-01-25 HOT Meeting ITB
Project Status.ppt (BPA)152.
2006-01-25
Ed wants to kill ITB project in favor of a project for him153.
2006-01-26 Ed Has Conflict of Interest154.
2006-02-17 Ice Harbor Data and Analysis.pdf155.
2006-02-18 Kootenai River Letter from USDOI to USACE HDC and DOE BPA.html156.
2006-02-21
Ice Harbor Field Test (Ramirez)157.
2006-02-01
Ice Harbor data (Ramirez)158.
2006-03-01 Optimization.ppt159.
2006-03-01
Pg14 ITB Code Running On GDACS.jpg160.
2006-03-01 Dan R Update on ITB
Status.htm161. 2006-03-03 HOT PPT
Page 3.JPG162.
2006-03-03
HOT Meeting PowerPoint (HDC).htm163.
2006-03-03 HOT Powerpoint.pdf164.
2006-03-03 HOT PPT all.jpg165.
2006-03-03 HOT PPT Page
1.JPG166.
2006-03-03 HOT PPT Page
2.JPG167.
2006-03-03 HOT PPT Page
3.JPG168.
2006-03-22
IEEE 1147-2005 2006-03-22 Rehab powerplants.pdf169.
2006-03-28 ATECo Ice Harbor Analysis170.
2006-04-01 Performance Period TimeLine
(ATECo)171.
2006-04-01 T1
FY06 Plan and Beyond (HDC)172.
2006-04-24 BPA to
Corps with ppt (Murphy)173.
2006-05-23 HOT Minutes.pdf174.
2006-06-01 Effects of
Turbine Passage on Salmon at Wanapum (Cada et al) 175.
2006-06-01 Improving Operations on The Columbia (Murphy)176.
2006-06-01
Efforts to reduce mortality to Hydroelectric Turbine-Passed fish (Cada et al)177.
2006-06-06 Must give
name.pdf178.
2006-06-08
Contract In-House for ITB.html179.
2006-06-13 CID
Report FA14-2035.pdf180.
2006-06-29
BPA Review of Contract (Jones).pdf181. 2006-07-01
Index Test Box Final Report uncirculated (Sheldon)182.
2006-07-31
Optimizing Dam Operations for Power and Fish (USACE, DOE)183.
2006-08-01
Kaplan Example (Hydro Performance Processes)184.
2006-08-11 One Pager.pdf185.
2006-08-13 Hydro Review excerpt USACE contract AGCo.jpg186. 2006-09-03
BPA HOT Contracting Difficulties.htm187.
2006-09-12 HOT Minutes.htm188.
2006-09-12
PowerPoint Reccomendations.pdf189.
2006-09-01
Reduced Spill at Hydropower Dams (Coutant et al)190.
2006-09-01
Index Test Box Final Report from HDC to HOT (Sheldon)191.
2006-09-19 WSJ fish kill (Fialca)192.
2006-09-29
A new Graphical Method to Reduce Turbine Index Test Data (Sheldon)193.
2006-10-06 blade spiral.htm194.
2007-07-01
Sensorfish-07-03399.pdf195.
2007-01-04 HDC Job
Solicitation.pdf196.
2008-01-03 FOIA Cover Letter (no other ITB contract).pdf]197. 2007-01-23 HOT Minutes No Longer Called Index Test Box.htm198.
2007-01-30
Very Simple Kaplan Turbine Design (Ingram)199.
2007-03-11
3-D Cam and Blade Survey Part-1.pdf200.
2007-03-11
3-D Cam and Blade Survey Part-2.pdf201. 2007-05-16
HOT Meeting Minutes.pdf HDC Pitch T1 box (or Gate Blade Optimizer)202.
2007-07-01 DOE Hydropower Program Biennial Report for FY
2005-2006203.
2007-07-02 T1Data
Gathering Device.htm204.
2007-08-01
Biological Assessment of the Advanced Turbine Design at Wanapum Dam, 2005
(Dauble et al)205.
2007-08-06 DOE IG Whistleblower referral FOIA Denial206.
2007-08-14 HOT Minutes.pdf
GBO Report Automatic Flushing system program, Blade-Gate Controller (BGO)
pitch GBO Verification207.
2007-09-11 Manzullo to GSA208. 2007-11-01 Determining the Effect of Shear Stress on Fish
Mortality during Turbine Passage (Cada et al)209. 2007-11-07 General Martin
moves on.html210. 2007-12-06 HOT Minutes.htm T1
Perturbation, T2 and Flushing system 211. 2008-01-01
Northwest Hydro Operators Forum (BPA)212. 2008-01-03 FOIA Cover Letter (no other ITB contract).pdf213. 2008-02-08 HDC FOIA
Response.pdf214.
2008-03-01 Optimization of
Hydro Power Plants (Cateni et al) 215. 2008-03-03
Letter to BPA HOT Committee.pdf216. 2008-03-04
Pre-HOT Meeting announcement.jpg217. 2008-03-11 HOT
Minutes.pdf Dan R, abbreviated surveys, HDC 3-D Cam Operational tests,
Hard Cams, T1 Roadmap218. 2008-03-25 DOE IG Waste of funds.pdf219.
2008-05-05
NOAA Fisheries Biological Opinion Executive Summary.pdf220. 2008-06-01 Testing Time for
Kaplans (Albright)221. 2008-06-13
Digital Governor Solicitation (HDC)222.
2008-06-13 Hydro Review AGCo Contract Award.html223.
2008-07-06
Optimizing Generating Efficiency of Entire Powerhouses (Sheldon)224.
2008-06-17
NW-Hydro Operators Forum (Murphy)225.
2008-06-24
Winter Kennedy Flushing Solicitation for
McNary W9127N-08-Q-0076 226.
2008-08-03
IGHEM Italy Turbine Upgrade Efficiency (Aldo Cateni et al)227.
2008-09-01
Award in Reno (Sheldon pg-13).pdf228.
2008-10-02 HOT Meeting229.
2008-10-03
HOT Meeting (annotated)230.
2008-12-01 Iron Gate Dam Turbine Performance Air Admission
Tests.pdf231.
2009-06-10
W9127N04D0009 Contract Evaluation.htm232.
2009-06-12 Contract
Evaluation.htm233.
2009-06-14 Letter to Steven Wright at BPA (Albright)234.
2009-06-15 W9127N04D0009 Contract Evaluation.doc235.
2009-06-15
W9127N04D0009Contract Evaluation Brief.doc236.
2009-06-15
IG letter about Contract evaluation.html237.
2009-08-14 Numerical Prediction of Vortex Rope in the Draft
Tube (Lipej)238.
2009-08-21
USACE Contract closing memorandum.pdf239.
2009-09-04 ATECo
Response.htm240.
2009-10-21
HOT Mtg FOIA T1 at Chief Joseph Dam241.
2009-12-01 Performance Testing of SHP Stations (Government of
India)242.
2010-01-10
Reish Letter.html243.
2010-04-19 HOT Meeting
Minutes (BPA) 244.
2010-07-01
Efficiency Testing-New Method to Determine Turbine Absolute Flow and Absolute
Efficiency Data (Sheldon).htm245.
2010-08-06 BPA Hot Meeting
Minutes.pdf246.
2010-09-17
DOE Information Letter (Albright)247. 2010-09-21
ITB Product Description.htm248.
2010-10-21 Gate Blade
Optimizer Status - promises made.pdf249.
2010-10-23 Improved WK Calibration Method
(D.R. Topham)250.
2010-10-23 Kaplan
Optimization251.
2011-01-31
Optimization Tests of Classic Kaplan Turbines (A. Adamkowski) 252.
2011-02-01
Turbine Survival Program (NWPCC)253.
2011-02-27 Turbine Survival
Program.pdf (NWPCC)254.
2011-04-10 BPA HOT Agenda Doc0.pdf255.
2011-04-10
BPA HOT Agenda Doc1.pdf256.
2011-04-10 BPA HOT Agenda Doc2.pdf257.
2011-05-10 HOT Minutes
basics, timeline and funding.pdf
257b. 2011-05-16_Letter_To_Judge_Redden_(Sheldon)258.
2011-06-16 Hydro Optimization on the Columbia (Allen)259.
2011-06-28 Email to Gary Fredricks.html260.
2011-07-04
Email to GAO re Kaplan turbines and fish.html261.
2011-08-19 Optimizing
multi-unit-powerhouses-a-new-method (Parker et al)262.
2011-08-29
ORNL Hydropower Asset Assessment Project (BSmith)263.
2011-09-01
Determining the Best Methods for Reducing Fish Mortality (Cada, Amaral)264.
2011-09-14 DOE FOIA
BPA-2011-1861-F265.
2011-10-01 AQFlow Flowmeter Test for PTC-18266.
2011-10-06 BPA FOIA Response.html267.
2011-11-02
Design Concept of Hydro Cascade Control System (V Fustek)268.
2011-11-17 HOT Minutes.pdf269.
2011-12-06
Best Practice Catalog-Propeller-Kaplan Turbine (ORNL)270.
2012-01-01
GMS Study 2012 (Taylor, Proulx & Lampa)271.
2012-01-01 Performance Testing 20SHP Stations in India (Dr.
H.K. Verma)272.
2012-03-01 Method
to Develop Cam Curves from a Single Index Test (Sheldon)273.
2012-06-27
Experimental Analysis of Optimal Cam For Kaplan Turbine274.
2012-09-25
Northwest Hydro Operators Forum 2012 Fall
Program (BPA)275.
2012-12-01 BPA-2012-01066-FOIA
Response.pdf276.
2013-03-01
Real Time Performance Calculation (D.Q.
Feng et al).pdf277.
2013-05-21
HOT JOC Brief (BPA)278.
2013-06-12
Optimizing Multi-Unit Powerhouses: Method to Compute Unit Selection and Load
Sharing (Bass et al)279.
2013-09-16 TVA Does not use Sliding Gate FOIA response
email.html280.
2013-11-01 Turbine Optimization for Passage of Juvenile Salmon
(HDC).pdf281.
2014-01-09
Selected Experiences with Optimization Tests of Kaplan Turbines (Adamkowski et
al)282.
2014-03-26 HOT Meeting Docs.pdf283.
2014 Fall 8-Kaplan Kuhl Lai Lainel.pdf284.
2014-12-29 FOIA Request Douglas Albright.pdf285.
2015-01-05 BPA-2015-00456-FRequest.pdf286.
2015-01-20 FOIA
Extension.pdf287.
2015-02-06 US Extends bidding for cavitation repair at 58MW
Clarence Cannon Dam288.
2015-04-06 HOT Agenda289.
2015-04-06
HOT Minutes290.
2015-05-19 Balancing Unit Efficiency and Fish Passage291.
2015-06-18 JAG Brush-Off.pdf292.
2015-10-20 RE Revisit the Automatic Index Test Box for Kaplan
Turbines293.
2016-01-01 Synopsis of HOT
Meetings.htm294.
2016-05-16 FOIA Response
verified, collected and stored.295.
2016-06-20 FOIA Appeal
Denial296.
2016-06-08 Frost Letter297.
2016-07-20 FOIA Denial298.
2017-05-03
2016-11-09 HOT Meeting-DRAFT-SUMMARY299.
2016-11-09
HOT Meeting Agenda-draft (1)300.
2016-11-09
HOT Meeting Agenda-draft (2)301.
2017-01-16 Automatic Unattended Index Testing is Available
Now.htm302.
2017-02-11 Sheldon’s NEPA
letter.pdf303.
2017-02-24BPA-2017-00309-F-ReleaseandClosureLetter.zip304.
2017-04-19
BPA-2017-01396-Binderof7pageswithRedactionsApplied.pdf305.
2017-05-03 2016-11-09 HOT Meeting-DRAFT-SUMMARY.pdf306.
2017-05-03
2016-11-09 HOT Meeting Agenda-draft (1).pdf307.
2017-05-03
2016-11-09 HOT Meeting Agenda-draft (2).pdf308.
2017-05-03
2016-11-09 HOT Team Actions Tab.pdf309.
2017-05-03
2016-11-09 HOT Team Actions Tab 1 Current.pdf310.
2017-05-03
2016-11-09 HOT Team Actions Tab 3 Sheet3.pdf311.
2017-05-03
BPA-2017-00310-F-Albright-FOIA Records Release & Closure Follow-Up.html312.
2017-05-03
BPA FOIA Closure Letter.pdf313.
2017-05-03 Cover
Letter.pdf314.
2017-05-17 F-Albright Acknowledgment and Closure w No records
Letter 051517.pdf315.
2017-07-13 BPA
FOIA Response.zip316.
2017-09-01
BPA-2017-01396-F-AlbrightReleaseandClosureLetter090117.pdf317.
2017-10-26
HOT Meeting DRAFT Agenda (1).pdf318.
2017-10-26
HOT Meeting DRAFT Agenda (2).pdf319.
2017-11-22 HOT Funding Memos320.
2018-01-04
BPA-2017-00310-F-Albright-FOIA Records Release and Closure.html321.
2017-02-11 Sheldon’s NEPA
letter.pdf322.
2018-04-09
Doug Albright FOIA Clarification.htm323.
2018-05-01 How Adjusting Mechanical Governor Can Save $1
Million (Patla, Van Winkle and Parrish)324.
2018-09-13 Power Cam
Relationship (Voitenok et al)325.
2019-03-25
Letter from HDC on GBO Status.html326.
2019-03-25
Letter from HDC on GBO Status.pdf327.
2019-05-14
Heather Breaks Contact $168.htm328.
2019-05-20 1st FOIA
No Data HDC.htm329.
2019-08-28-FOIA
Appeal BPA-2017-00310-F-Albright-FOIA.htm330.
2020-01-03
BPA-2020-00255-F-Ackn. & Response331.
2020-01-03
BPA-2020-00255-F Responsive Information332.
2020-01-03
BPA-2020-00255-F FCRPS Plants333.
2020-01-03
BPA-2020-00255-F Generation Data334.
2020-01-03
BPA-2020-00255-F Revenue Data335.
2020-02-21
Whistleblower protection RE Non-DoD Source FW Restart IG Complaint.htm336.
2020-08-24 Iso-Power cam curve
testing for optimal blades/wicket gates law for Kaplan Turbines (J. Cavalier)
337. 2021-01-11_Letter_to_James_Walsh_Chairman_of_ASME_PTC-18 Committee.htm
338.
2020-09-20 Cost of Spill.xlsx339.
2020-01-17
Synopsis of HOT Meetings.htm340.
Time Line of HOT and
others.doc341.
Time Line of HOT and others.htm342.
Best
Available Science343.
McNary Video
Resources
1.
Advanced (Fish-Friendly) Hydropower Turbine Design Development - Project 58.003 (EPRI)
2.
Alden
Screw Turbine (Spring)
3.
Chem Info
4.
Conawingo Dam
5.
Constant Power Testing (Albright)
6.
Idaho
National Laboratory Information Bridge - Hydropower Program: Advanced
Turbine Systems (INL)
7.
Mica Dam, Columbia-Shuswap, BCV0A,
Canada
8.
Northwest Power and
Conservation Council Website
9.
Old Woodward.com
10.
Optimization
(Sheldon)
11.
Pilot Valve Plate
12.
PJM Power Dispatcher
Primer, part-01
13.
PJM Power Dispatcher Primer, part-02
14.
W.A.C. Bennett Dam, Hudson's Hope,
BCV0C, Canada
15.
Water Turbines (Deriaz).pdf
16.
Woodward History Page
17.
Email to Senator
Tammy Duckworth
style="color: windowtext; text-decoration: none;">
