1.  1907-01-01 Water Power Engineering (Daniel W. Mead) 

1b   1908-01-01_Water Power Engineering (Daniel W. Mead) - Corrected
2.     1923-01-01 Hydro-Electric Power Stations (David Rushmore & Eric Lof)
3.     1929-09-02 Simple Basis for Securing Efficient Hydro Operation (F. Nagler)
4.     1933-04-01 Improved Type of Flow Meter for Hydraulic Turbines (I.A. Winter)
a.      usbr.gov tech references
5.     1940-12-02 Turbine Efficiency At Safe Harbor (Mousson)
6.     2011-01-01 PTC-18 Credits Page
7.     1949-01-01 PTC-18 Index Test Supplement (ASME)
8.     1950-01-01 Hydroelectric Handbook (Creager, Justin)
9.     1951-01-01 Water Turbines excerpted from "Hydro-electric Engineering Practice (P.E. Deriaz)

9b. 1951-07-01 Index Testing of Hydraulic Turbines (Voaden)

10. 1953-12-03 Optimum Adjustment of Control Loops (Oldenburger)
11.
1954-01-01 Selecting Hydraulic Reaction Turbines (USBR)
12. 1954-01-11 Frequency Response Data Presentation Methods (Rufus Oldenberger)
13. 1951-07-01 Index Testing of Hydraulic Turbines (Voaden)
14. 1956-01-01 Speech notes (Voaden)
15. 1957-08-01 NEMA Code.pdf
16. 1958-09-01 Determination of WR^2 (NEMA)
17. 1961-02-01 The Instability of Stratified Flow (Mittendorf M.S. Thesis, State University of Iowa, available on loan)
18. 1963-05-01 Turbine Testing by the Gibson and Index Methods (USACE)
19. 1966-10-05 The Controlled System (M Leum)
20. 1967-12-01 Field Observations of Transient Servopressures In Kaplan Turbines (Mittendorf, Verna)
20a. 1969-12-09 US Patent 3,483,364 3-D Cam.(Leeson).pdf
21.
1970-07-08 Mark Invites George (Leum)
22. 1976-11-01 Viktor Kaplan: Life and Work (H. Häckert)
23. 1977-06-17 Analysis of PID Governors in MultiMachine Systems (Manitoba Hydro)
24. 1977-01-01 Estimating Reversible Pump Turbine Characteristics (USBR)
25. 1977-01-01 Development of the Kaplan Turbine (Hanns G. Hansson)
26. 1978-01-01 Woodward Rev-1 3-D Cam (WGC)
27. 1981-04-01 Governing Kaplan Turbines for Transient Loads
28. 1982-01-01 Field Testing Hydro Turbines (Lee Sheldon)
29. 1984-09-01 Measurement  of  Real-Time  Turbine  Efficiency  (Erickson, Graber)
30. 1985-04-26 ITB First Field Test (Albright)
31. 1985-09-18 Clarence Cannon Test Procedure (Sachs)
32. 1985-09-18 Clarence Cannon Test Report (Sachs)
33. 1986-01-14 BPA Seeking ITB Demonstration (Sheldon)
34. 1986-03-24 ITB Field Test Report (Albright)
35. 1986-03-26 ITB Detailed Field Test (Albright)
36. 1986-03-27 Report on Index Test box (Dave Bishoff)
37. 1986-04-16 Analysis of Clarence Cannon Data (Sheldon)
38. 1986-06-11 BPA to Corps (Myers)

38b 1986-07-03 ITB Pitch to Idaho Falls Power (Sheldon)

38b 1986-07-03 ITB Pitch to Idaho Falls Power - annotated (Sheldon)

38c   1986-07-07 BPA Will Send PO (Sheldon)
39. 1986-11-01 Checking Turbine Performance by Index Testing (Kirkland, Brice).pdf
40. 1987-03-01 Prime Times ITB
41. 1987-03-01 Prime Times T-700
42. Dr. Hook and his Medicine Show
43. 1987-06-01 Little Black Box for Index Testing (Albright)
44. 1987-07-01 Little Black Box (Albright) Ori
45. 1987-08-21 Optimization of Bulb and Kaplan Turbine Runners (B. Velensek)
46. 1987-09-01 PGE-PHP-2 Report (Gary Hackett)
47. 1987-12-01 PGE-PHP-2 Report (Terry Bauman)
48. 1987-12-04 Analysis of  Bull  Run  (Sheldon)
49. 1988-05-28 PHP2 Classic Test (Sheldon)
50.
1988-05-01 Kaplan Turbines: Design Trends (A. Lugarosi & A. Massa)
51. 1988-08-01 Index Testing (Steendahl)
52. 1988-08-01 Effect of Fish Diversion Screen on Turbine Efficiency (D. Lemon et al).pdf
53. 1988-12-27 U.S. Patent# 4,794,544 (Albright & George Mittendorf)
54. 1989-03-01 Prime Times ITB

54b 1989-03-01 George's Idea.jpg
55. 1989-08-01 Determining Turbine Efficiency by Index Testing Hydro Review Tech Briefs (Sheldon)

55b 1989-08-23_Joint_Load_Optimization_(D.Jones).pdf
56. 1990-03-27 Evaluation of USACE's "automatic index testing device"  (Sheldon)
57. 1990-04-01 Woodward did not use ITB technology
58. 1990-04-01 History of USACE 3D Cam (various newspaper clips)
59. 1991-01-01 IEC-41 Index Testing Winter Kennedy
60. 1991-06-01 Effects of Hydroelectric Turbine Passage on Fish Early Life Stages (Cada)
61. 1993-01-01 Modern Errors in Winter Kennedy (Sheldon)

61a  1993-05-17 ATECo Incorporation Papers

61b  1994-07 Woodward Ad in IWP&DC.pdf

61c  1995-1-1 Diagnostic Evaluation of Turbine EfficiencyProfiles and Data (Lee Sheldon)
62. 1995-01-01 Opt-Ease Brochure (Sheldon)
63. 1995-01-01 Optimization Efficiency of Multi unit Hydro Plants (Sheldon)

63b  1995-12-31 Improving Efficiency of a 4-Unit Generating Station (D.L. Kornegay)
64. 1995-04-18 Turbine passage survival estimation for chinook salmon smolts (Oncorhynchus tshawytscha) at a large dam on the Columbia River (Mathur, Heisey, Euston, Skalski and Hays)
65. 1995-08-25 Joint  Load  Optimization  (Dave  Kornegay)

65a  1996-10-10 Fish passage mitigation of impacts from hydroelectric power projects in the US (Cada)
66. 1995-10-27 21st Century Advanced Hydropower Turbine System (Brookshier et. al.)
67. 1996-01-01 IGHEM Montreal Experience at Index Testing.pdf 
68. 1997-01-01 U.S. Hydropower Resource Assessment for Illinois (Reinhart et al)
69. 1997-07-01 Diagnostic Evaluation of Turbine Efficiency Profiles and data (Sheldon)
70. 1997-10-01 downstream Passage for Salmon at Hydroelectric Projects in the Columbia River Basin: Development, Installation and Evaluation (Whitney, Calvin, Erho & Coutant)
 71. 1997-03-06 Shaken Not  Stirred  Recipe  for  Fish-Friendly  Turbine (Cada)
72. 1997-03-01 Development of Biological Criteria for the Design of Advanced Hydropower Turbines (Cada, Coutant)
73. 1997-05-01 Sliding  Gate  Method  (Almquist, March & Franseen)
74. (2013-01-01 Late Note: A FOIA for Sliding Gate data learned it didn't work.)
75. 1998-01-01 Measuring the effect of Fish Diversion Screens (Lemon, Wittinger et al)
76. 1998-06-01 Reviewing the Approaches to Hydro Optimization (Sheldon)

77. 1998-06-01 Little Black Box.jpg
78. 1999-07-01 Summary of Environmentally Friendly Turbine Design Concepts (Odeh)
79. 1999-08-10 The Infinite Turbine (Janet Wood)
80. 1999-08-10 Water Power Magazine The Infinite Turbine (Wood)

81. 1999-12-01 It's Not Easy Being Green (March, Fisher).pdf
82. 1999-01-01 Status of U.S. Department  Of  Energy's  Advanced  Hydropower  Turbine  Systems  Program  (Sale, Cada, Reinhart, Sommers, Brookshier, Flynn)
83. 2000-04-01 Tools for Environmental Monitoring and Response at Hydro Projects (Faulkner)
84. 2000-04-25 Hydropower R&D: Recent Advances in Turbine Passage Technology (Brookshire, Reinhart, Cada)
85. 2000-04-01 Tools for Hydro Environmental Monitoring (Faulkner)

85a  2000-05-10 Enron T2 Pitch to BPA with Enclosures (Sheldon)

85b 2000-05-11 ITB Pitch added to ENRON Pitch at Type-1 to BPA (Sheldon)

86. 2000-12-04 BPA Completes GDACS @ McNary (BPA)
87. 2001-01-01 Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Powerhouse 1 (Carlson)
89. 2001-09-01 Development of Advanced Hydroelectric Turbines to Improve Fish Passage Survival (Cada et. al.)
90. 2001-12-01 HydroPower in Norway Title Page.pdf
91. 2001-12-01 Blanket Contract and Sole Source Justification.htm
92. 2001-12-01 Hydropower in Norway Mechanical Equipment (Arne Kjolle)
94. 2002-04-01 Tools  For  Environmental  Monitoring  and  Response  at  Hydro  Projects
95. 2002-01-01 Application of Biological Design Criteria in Kaplan turbines. (ORNL)

95b. 2002-05 Certifying Hydropower for "Green Energy" Markets.

95c.  https://lowimpacthydro.org/
96. 2003-02-06 ATECo Quote to Lee Sheldon at HDC (Albright)
97. 2003-03-01 Evolution of Sensor Fish Device for Measuring Physical Conditions in Severe Hydraulic Environments (T.J.Carlson et al)
98. 2003-03-01 Regulatory Approaches for Dissolved Oxygen at Hydropower Facilities (ORNL Peterson et. al.)
99. 2003-08-01 Optimizing the Corps Hydroelectric Generation on the Columbia River (Wittinger)

99b  2003-08-06 Price Negotiation Memorandum.pdf
100. 2003-08-07 ITB Cost Estimate (Wittinger)

100b  2003-08-07 ITB Cost Estimate (Wittinger)
101. 2003-08-07 ATECo Sole Source Justification (Wittinger)

101a 2003-08-23 USACE Invoice for T1 Optimizer.pdf
102. 2003-08-29 ITB Scope of Work (Roll, Wittinger)
103. 2003-09-01 Identifying Effects on Fish of Pressure Changes during Turbine Passage (Abernathy, Becker & Dauble)
104. Spare
105. 2003-09-06 USACE ITB Solicitation #1 (HDC)
106. 2003-09-12 USACE ITB Solicitation #2 (HDC)
107. 2003-10-20 Software Report (ATECo)
108. 2003-10-20 Screen Gallery (ATECo)
109.  2003-10-24 AGCo Claims ITB.pdf
110.  2003-12-27 Woodward's Patent Expires 

110b  2004-01-20 Copyrights and Patents of Optimization Technology (Wittinger).pdf

110b  2004-04-01_Fish_Passage_Throught FCRPS Dams.pdf
111.  2004-05-26 USACE Contract W9127N-04-D-0009 for Type-1 Optimizer (Ebner)
112.  2004-05-26 USACE Contract Special License Agreement (Ebner)
113.  2004-04-04 TX 6-006-161 ITB Software Copyright  (Albright)
114.  2004-07-01 Six-Degree of Freedom Sensor Fish Design (Deng et. al.)
115.  2004-07-29 Turbine Data Request.pdf

115a.   

115b.2004-08-30_HDC_Emails.pdf
116.  2004-10-12 Pre-Stop Work Memo.pdf
117.  2004-10-14 Stop Work Memo and causes.htm
118.  2004-10-28 HOT Minutes.pdf
119.  2004-11-02 ANSI IEEE Std-1207 Excerpt (IEEE)

119b.  2004-11-02_IEEE_Std-1207_Members.JPG 

120. 2005-04-21 Lee's Opt-Ease Ptich for The Dalles Dam (Sheldon)  
121.  2005-04-22 T1 future.pdf
122.  2005-04-25 Modification to 3D Cam Function Needed for ITB (Miska)
123.  2005-05-18 ACSI McNary GDACS Reconfigure for ITB
124.  2005-06-01 Kaplan cam tuning procedure by Aleksandar Gajic et al.pdf
125.  2005-06-01 Draft Best Practices WPXIV Hydro Performance Processes R8 (March et al)
126.  2005-06-08 04-D-0009-P00001 Ed as PM TL&POC.pdf
127.  2005-06-22 What Ed Miska Directed Me to Remove from the ITB Rev1 br4.pdf
128.  2005-07-14 Good News No Zero problem.pdf
129.  2005-08-03 HDC explains zero problem.pdf
130.  2005-08-11 ITB Project Interim Status Report.doc

130b. 2005-09-01_Visit_to_ACSI_Blade-Gate-spiral.pdf
131.  2005-09-01 PIER Research on Fish Passage at California Hydropower (CA Energy Commission Staff).pdf
132.  2005-09-15 ITB Manual to Rod.html 
133.  2005-11-01 Evaluation of Blade-Strike Models of Kaplan Turbines (PNNL)

133b.  2005-11-07_The Value of Economic Dispatch_(DoE)

133c. 2005-11-23 Haggling with Ebner
134.  2005-11-27 ITB Manual to Rod.html
135.  2005-11-30 Zeroing Out the Messenger (Harden).htm
136.  2005-12-05 T1 Bench Testing MFR.pdf
137.  2005-12-07 Tech info to HDC
138.  2005-12-12 McNary Field Test (Wittinger)
139.  2005-12-14 T1 Test Log.htm

139a 2005-12-13 Unit-9 2-Deg Big Loop No Avg.jpg
140.  2005-12-15 Unit 9 3-D cam W Screens.jpg

141.  2005-12-16 ITB Field Test Data Report.pdf
142.  2005-12-16 Bad Program Icon.pdf
143.  2005-12-30 McNary Unit-9 Index Test.html

143a 2006-01-01_T1_FY06_Plan_and_Beyond.pdf
144.  2006-01-16 McNary Field Test (Albright)
145.  2006-01-16 ITB McNary Field Test.html
146.  2006-01-17 haggling prices with Ebner
147.  2006-01-23 List of Fixes before Ice Harbor Test.pdf
148.  2006-01-25 ITB Price to COE.html
149.  2006-01-25 HOT Minutes.htm
150.    2006-01-25 ITB Project Specification.htm
151.  2006-01-25 HOT Meeting ITB Project Status.ppt (BPA)
152.  2006-01-25 Ed wants to kill ITB project in favor of a project for him
153.  2006-01-26 Ed Has Conflict of Interest
154.  2006-02-17 Ice Harbor Data and Analysis.pdf
155.              2006-02-18 Kootenai River Letter from USDOI to USACE HDC and DOE BPA.html
156.  2006-02-21 Ice Harbor Field Test (Ramirez)
157.  2006-02-01 Ice Harbor data (Ramirez)
158.  2006-03-01 Optimization.ppt
159.  2006-03-01 Pg14 ITB Code Running On GDACS.jpg
160.  2006-03-01 Dan R Update on ITB Status.htm
161.  2006-03-03 HOT PPT Page 3.JPG
162.  2006-03-03 HOT Meeting PowerPoint (HDC).htm
163.  2006-03-03 HOT Powerpoint.pdf
164.  2006-03-03 HOT PPT all.jpg
165.  2006-03-03 HOT PPT Page 1.JPG
166.   2006-03-03 HOT PPT Page 2.JPG
167.   2006-03-03 HOT PPT Page 3.JPG
168.   2006-03-22 IEEE 1147-2005 2006-03-22 Rehab powerplants.pdf
169.   2006-03-28 ATECo Ice Harbor Analysis
170.   2006-04-01 Performance Period TimeLine (ATECo)
171.   2006-04-01 T1 FY06 Plan and Beyond (HDC)
172.   2006-04-24 BPA to Corps with ppt (Murphy)
173.   2006-05-23 HOT Minutes.pdf
174.   2006-06-01 Effects of Turbine Passage on Salmon at Wanapum (Cada et al) 
175.   2006-06-01 Improving Operations on The Columbia (Murphy)
176.   2006-06-01 Efforts to reduce mortality to Hydroelectric Turbine-Passed fish (Cada et al)
177.   2006-06-06 Must give name.pdf
178.   2006-06-08 Contract In-House for ITB.html

178b 2006-06-09 In-House Hired-Contractor to CID.pdf

179.   2006-06-13 CID Report FA14-2035.pdf

179b.   2006-06-14 Ebner to Loeffler contract modified without Ebner or my knowledge.doc
180.   2006-06-29 BPA Review of Contract (Jones).pdf

180b  2006 Draft of "A Report on Procurement and Demonstration Index Test Box" (Sheldon).pdf
181.    2006-07-01 Index Test Box Final Report uncirculated (Sheldon)
182.   2006-07-31 Optimizing Dam Operations for Power and Fish (USACE, DOE)
183.   2006-08-01 Kaplan Example (Hydro Performance Processes)
184.   2006-08-11 One Pager.pdf
185.   2006-08-13 Hydro Review excerpt USACE contract AGCo.jpg

185b   2006-09-01 Index Test Box Final Report from HDC to HOT (Sheldon)
186.   2006-09-03 BPA HOT Contracting Difficulties.htm
187.   2006-09-12 HOT Minutes.htm
188.   2006-09-12 PowerPoint Reccomendations.pdf
189.   2006-09-01 Reduced Spill at Hydropower Dams (Coutant et al)
190.  spare
191.   2006-09-19 WSJ fish kill (Fialca)
192.   2006-09-29 A new Graphical Method to Reduce Turbine Index Test Data (Sheldon)
193.   2006-10-06 blade spiral.htm
194.   2007-07-01 Sensorfish-07-03399.pdf
195.   2007-01-04 HDC Job Solicitation.pdf
196.   2008-01-03 FOIA Cover Letter (no other ITB contract).pdf
197. 2007-01-23 HOT Minutes No Longer Called Index Test Box.htm
198.   2007-01-30 Very Simple Kaplan Turbine Design (Ingram)

198b. 2007-03-01_Ralph_Coloqy_over_contract-tampering.pdf

198c  2007-03-07_Ebner_tries_to_explain-away_Ed's_contract_mod
199.   2007-03-11 3-D Cam and Blade Survey Part-1.pdf
200.   2007-03-11 3-D Cam and Blade Survey Part-2.pdf

200a 2007-05-08_USACE_FOIA_Search_for_Prior_Contract.pdf

200b 2007-05-14_ATECo_Questions_to_USACE_IG
201.   2007-05-16 HOT Meeting Minutes.pdf   HDC Pitch T1 box (or Gate Blade Optimizer)

201b  2007-06-05_Contract_Page_MarkK_as_Technical_Contact
202.           2007-07-01 DOE Hydropower Program Biennial Report for FY 2005-2006
203.   2007-07-02 T1Data Gathering Device.htm
204.  2007-08-01 Biological Assessment of the Advanced Turbine Design at Wanapum Dam, 2005 (Dauble et al)
205.  2007-08-06 DOE IG Whistleblower referral to DOD IG
206.  2007-08-14 HOT Minutes.pdf GBO Report Automatic Flushing system program, Blade-Gate Controller (BGO) pitch GBO Verification
207.  2007-09-11 Manzullo to GSA

208.  2007-11-01 Determining the Effect of Shear Stress on Fish Mortality during Turbine Passage (Cada et al)
209.  2007-11-07 General Martin moves on.html

209b 2007-11-17 Letter to Judge Redden's Clerk (Albright)
210.  2007-12-06 HOT Minutes.htm T1 Perturbation, T2 and  Flushing system
211.  2008-01-01 Northwest Hydro Operators Forum (BPA)
212.  2008-01-03 FOIA Cover Letter (no other ITB contract).pdf
213.  2008-02-08 HDC FOIA Response.pdf
214.  2008-03-01 Optimization of Hydro Power Plants (Cateni et al)
215.  2008-03-03 Letter to BPA HOT Committee.pdf
216.  2008-03-04 Pre-HOT Meeting announcement.jpg
217.   2008-03-11 HOT Minutes.pdf Dan R, abbreviated surveys, HDC 3-D Cam Operational tests, Hard Cams, T1 Roadmap
218.   2008-03-25 DOE IG Waste of funds.pdf
219.   2008-05-05 NOAA Fisheries Biological Opinion Executive Summary.pdf
220.   2008-06-01 Testing Time for Kaplans (Albright)
221.   2008-06-13 Digital Governor Solicitation (HDC)
222.   2008-06-13 Hydro Review AGCo Contract Award.html
223.  2008-07-06 Optimizing Generating Efficiency of Entire Powerhouses (Sheldon)
224.   2008-06-17 NW-Hydro Operators Forum (Murphy)
225.  2008-06-24 Winter  Kennedy  Flushing Solicitation for McNary W9127N-08-Q-0076
226.  2008-08-03 IGHEM Italy Turbine Upgrade Efficiency (Aldo Cateni et al)
227.   2008-09-01 Award in Reno (Sheldon pg-13).pdf
228.   2008-10-02 HOT Meeting
229.   2008-10-03 HOT Meeting (annotated)
230.   2008-12-01 Iron Gate Dam Turbine Performance Air Admission Tests.pdf
231.   2009-06-10 W9127N04D0009 Contract Evaluation.htm
232.   2009-06-12 Contract Evaluation.htm
233.   2009-06-14 Letter to Steven Wright at BPA (Albright)
234.   2009-06-15 W9127N04D0009 Contract Evaluation.doc
235.   2009-06-15 W9127N04D0009Contract Evaluation Brief.doc
236.   2009-06-15 IG letter about Contract evaluation.html
237.   2009-08-14 Numerical Prediction of Vortex Rope in the Draft Tube (Lipej)
238.   2009-08-21 USACE Contract closing memorandum.pdf
239.   2009-09-04 ATECo Response.htm
240.   2009-10-21 HOT Mtg FOIA T1 at Chief Joseph Dam
241.   2009-12-01 Performance Testing of SHP Stations (Government of India)

241b 2009-12-21 Closing Letter From Colonel Miles.pdf
242.   2010-01-10 Reish Letter.html

243.   2010-04-19 HOT Meeting Minutes (BPA) 
244.   2010-07-01 Efficiency Testing-New Method to Determine Turbine Absolute Flow and Absolute Efficiency Data (Sheldon).htm
245.   2010-08-06 BPA Hot Meeting Minutes.pdf
246.   2010-09-17 DOE Information Letter (Albright)
247.   2010-09-21 ITB Product Description.htm

248. 2010-10-23 Improved WK Calibration Method (D.R. Topham)
249.   2010-10-23 Kaplan Optimization

250. 2010-12-06_Murphy_ORNL_Dave
251.   2011-01-31 Optimization Tests of Classic Kaplan Turbines (A. Adamkowski)
252.   2011-02-01 Turbine Survival Program (NWPCC)
253.   2011-02-27 Turbine Survival Program.pdf (NWPCC)
254.   2011-04-10 BPA  HOT  Agenda  Doc0.pdf
255.   2011-04-10 BPA HOT Agenda Doc1.pdf
256.   2011-04-10 BPA HOT Agenda Doc2.pdf
257.   2011-05-10 HOT Minutes basics, timeline and funding.pdf

257a 2011-05-16 Letter To Judge Redden (Sheldon)

257b 2011-05-17 Help On The Way Request (Jasmine).htm

257c 2011-05-19 What happened with Senator Kirk and Congressman Manzullo's offices.htm

257d 2011-06-09 Request For referral to GAO.htm

257e 2011-06-11 Referral to GAO.htm
258.   2011-06-16 Hydro Optimization on the Columbia (Allen)
259.   2011-06-28 Email to Gary Fredricks.html
260.   2011-07-04 Email to GAO re Kaplan turbines and fish.html
261.   2011-08-19 Optimizing multi-unit-powerhouses-a-new-method (Parker et al)
262.   2011-08-29 ORNL Hydropower Asset Assessment Project (BSmith)
263.   2011-09-01 Determining the Best Methods for Reducing Fish Mortality (Cada, Amaral)
264.           2011-09-14 DOE FOIA BPA-2011-1861-F
264b. 2011-09-22 George Mittendorf Obituary

265.   2011-10-01 AQFlow Flowmeter Test for PTC-18
266.   2011-10-06 BPA FOIA Response.html
267.   2011-11-02 Design Concept of Hydro Cascade Control System (V Fustek)
268.   2011-11-17 HOT Minutes.pdf
269.   2011-12-06 Best Practice Catalog-Propeller-Kaplan Turbine (ORNL)
270.   2012-01-01 GMS Study 2012 (Taylor, Proulx & Lampa)
271.   2012-01-01 Performance Testing 20SHP Stations in India (Dr. H.K. Verma)
272.   2012-03-01 Method to Develop Cam Curves from a Single Index Test (Sheldon)
273.   2012-06-27 Experimental Analysis of Optimal Cam For Kaplan Turbine
274.   2012-09-25 Northwest Hydro Operators Forum 2012 Fall Program (BPA)
275.   2012-12-01 BPA-2012-01066-FOIA Response.pdf
276.   2013-03-01 Real Time Performance Calculation (D.Q. Feng et al).pdf

276b. 2013-05-06 Ice Harbor Biological Study
277.   2013-05-21 HOT JOC Brief (BPA)
278.   2013-06-12 Optimizing Multi-Unit Powerhouses: Method to Compute Unit Selection and Load Sharing (Bass et al)
279.   2013-09-16 TVA Does not use Sliding Gate FOIA response email.html
280.   2013-11-01 Turbine Optimization for Passage of Juvenile Salmon (HDC).pdf
281.   2014-01-09 Selected Experiences with Optimization Tests of Kaplan Turbines (Adamkowski et al)
282.   2014-03-26 HOT Meeting Docs.pdf
283.   2014 Fall 8-Kaplan Kuhl Lai Lainel.pdf

283b 2014-05-20 Testing to Improve Fish Passage through the Ice Harbor Turbines

283c https://www.hydroreview.com/world-regions/testing-to-improve-fish-passage-through-the-ice-harbor-turbines/#gref

283d  2014-05-20 Testing to Improve Fish Passage through the Ice Harbor Turbines-Hydro Review.docx
284.   2014-12-29 FOIA Request Douglas Albright.pdf
285.   2015-01-05 BPA-2015-00456-FRequest.pdf
286.   2015-01-20 FOIA Extension.pdf
287.   2015-02-06 US Extends bidding for cavitation repair at 58MW Clarence Cannon Dam
288.   2015-04-06 HOT Agenda
289.   2015-04-06 HOT Minutes
290.   2015-05-19 Balancing Unit Efficiency and Fish Passage
291.   2015-06-18 JAG Brush-Off.pdf

291b. 2015-07-17 Mark Leum Obituary

291c. 2015-12-07 Hybrid Index Testing Draft (D. Boyter).pdf

291d.  2015-12-14 Dorena Index Test #1@69 Ft.pdf  

292.   2015-10-20 RE Revisit the Automatic Index Test Box for Kaplan Turbines

292b.  2015-10-28 BPA Hot Minutes Data has been verified, collected and stored (Patla)
293.   2016-01-01 Synopsis of HOT Meetings.htm

293b. 2016-02-04 Dorena Index Test #2 @48 Ft.pdf

293c. 2016-03-30 Dorena Index Test #3 @ 85 Ft.pdf
294.   2016-05-16 FOIA Response verified, collected and stored.
295.   2016-06-20 FOIA Appeal Denial
296.   2016-06-08 Frost Letter
297.   2016-07-20 FOIA Denial
298.   2017-05-03 2016-11-09 HOT Meeting-DRAFT-SUMMARY
299.   2016-11-09 HOT Meeting Agenda-draft (1)
300.   2016-11-09 HOT Meeting Agenda-draft (2)
301.   2017-01-16 Automatic Unattended Index Testing is Available Now.htm
302.   2017-02-11 Sheldon’s NEPA letter.pdf
303.   2017-02-24BPA-2017-00309-F-ReleaseandClosureLetter.zip
304.   2017-04-19 BPA-2017-01396-Binderof7pageswithRedactionsApplied.pdf
305.   2017-05-03 2016-11-09 HOT Meeting-DRAFT-SUMMARY.pdf
306.   2017-05-03 2016-11-09 HOT Meeting Agenda-draft (1).pdf
307.   2017-05-03 2016-11-09 HOT Meeting Agenda-draft (2).pdf
308.   2017-05-03 2016-11-09 HOT Team Actions Tab.pdf
309.   2017-05-03 2016-11-09 HOT Team Actions Tab 1 Current.pdf
310.   2017-05-03 2016-11-09 HOT Team Actions Tab 3 Sheet3.pdf
311.   2017-05-03 BPA-2017-00310-F-Albright-FOIA Records Release & Closure Follow-Up.html
312.   2017-05-03 BPA FOIA Closure Letter.pdf
313.   2017-05-03 Cover Letter.pdf
314.   2017-05-17 F-Albright Acknowledgment and Closure w No records Letter 051517.pdf
315.   2017-07-13 BPA FOIA Response.zip
316.   2017-09-01 BPA-2017-01396-F-AlbrightReleaseandClosureLetter090117.pdf
317.   2017-10-26 HOT Meeting DRAFT Agenda (1).pdf
318.   2017-10-26 HOT Meeting DRAFT Agenda (2).pdf
319.   2017-11-22 HOT Funding Memos

319b. 2018-01-03 Comparison of ITB Dorena Results to Hatch Inc. Results (P. Rodrigue, D. Albright)  

391c. Hatch Dorena Kaplan Unit Index Test (June2017)
320.   2018-01-04 BPA-2017-00310-F-Albright-FOIA Records Release and Closure.html
321.   2017-02-11 Sheldon’s NEPA letter.pdf
322.   2018-04-09 Doug Albright FOIA Clarification.htm
323.   2018-05-01 How Adjusting Mechanical Governor Can Save $1 Million (Patla, Van Winkle and Parrish)
324.   2018-09-13 Power Cam Relationship (Voitenok et al)

2018-10-13_Power_cam_relationship_(Voitenok_et._al.)_IGHEM_608 pdf

324b 2018-03-22 Start of a plan (Spain)

324c 2019-03-03 USACE Index Test Ice Harbor U6.pdf
325.   2019-03-25 Letter from HDC on GBO Status.html
326.   2019-03-25 Letter from HDC on GBO Status.pdf

326b 2019-04-01 Optimizing Kaplan Turbine Efficiency with Minimial Cost, Effort and Time (Sheldon).pdf
327.   2019-05-14 Heather Breaks Contact $168.htm
328.   2019-05-20 1st FOIA No Data HDC.htm

328b 2019-05-24 Research Costs #2 FOIA ReqNo 19016278 (Heather takes a powder)
329.   2019-08-28-FOIA Appeal BPA-2017-00310-F-Albright-FOIA.htm
330.   2020-01-03 BPA-2020-00255-F-Ackn. & Response
331.   2020-01-03 BPA-2020-00255-F Responsive Information
332.   2020-01-03 BPA-2020-00255-F FCRPS Plants
333.   2020-01-03 BPA-2020-00255-F Generation Data
334.   2020-01-03 BPA-2020-00255-F Revenue Data

334b 2020-01-30 DOE IG Hotline Case# 98272
335.   2020-02-21 Whistleblower protection RE Non-DoD Source FW Restart IG Complaint.htm

336.   2020-08-24 Iso-Power cam curve testing for optimal blades/wicket gates law for Kaplan Turbines (J. Cavalier)
337. 2021-01-11 Letter to James Walsh Chairman of ASME PTC-18 Committee.htm 

337b  2021-02-03 James Walsh Chairman of ASME PTC-18 Committee

337c  2021-09-29 A Brief History of the Kaplan Turbine Invention (energies)
338.
   2020-09-20 Cost of Spill.xlsx

339.   2020-01-17 Synopsis of HOT   Meetings.htm

339b 2021-1-1 A Brief History of the Kaplan Turbine Invention (Polák)

339c 2021-04-01 Understanding Hydropower Draft Tubes (Sheldon).htm 

399d 2022-01-15 How Einstein Learned Physics.htm
340.
   Time Line of HOT and others.doc
341.   Time Line of HOT and others.htm
342.   Best Available Science
343.   McNary Video

344. ITB Project Document Log
344b. Demonstration of offset error between GrossHead and NetHead.xlsx
Resources

1.     Advanced (Fish-Friendly) Hydropower Turbine Design Development -  Project 58.003 (EPRI)

2.     Alden Screw Turbine (Spring)

2b     Book Reviews

3.     Chem Info

4.     Conawingo Dam

5.     Constant Power Testing (Albright)

6.     Idaho National Laboratory Information Bridge - Hydropower Program: Advanced Turbine Systems (INL)

7.     Mica Dam, Columbia-Shuswap, BCV0A, Canada

8.     Northwest Power and Conservation Council Website

9.     Old Woodward.com

10. Optimization (Sheldon)

11. Pilot Valve Plate

12. PJM Power Dispatcher Primer, part-01

13. PJM Power Dispatcher Primer, part-02

14. W.A.C. Bennett Dam, Hudson's Hope, BCV0C, Canada

15. Water Turbines (Deriaz).pdf

16. Woodward History Page

17. Email to Senator Tammy Duckworth

18. Axle Alighment Explaination

19. Spill Data

20.

21.  CPI Inflation Calculator

22.  Mowat

Lee

Lee's Service Folder

Dave

Intro and Background

PT Interface Board.pdf

style="color: windowtext; text-decoration: none;">
Description: Description: Description: free counters